A platform for research: civil engineering, architecture and urbanism
Deep Water Harbour at Barbados
Main works comprise construction of protective breakwater, quay wall, inner berth, transit sheds, reclamation and bulk sugar installation; breakwater consists of inner arm 1006-ft in length and outer arm 1712 ft long, built of solid concrete blocks on rubble base; quay wall is also built of concrete blocks; storage and loading facilities are provided for bulk sugar handling; inner berth is 500 ft long, and transit sheds are provided for each of 2 berths at quay wall.
Deep Water Harbour at Barbados
Main works comprise construction of protective breakwater, quay wall, inner berth, transit sheds, reclamation and bulk sugar installation; breakwater consists of inner arm 1006-ft in length and outer arm 1712 ft long, built of solid concrete blocks on rubble base; quay wall is also built of concrete blocks; storage and loading facilities are provided for bulk sugar handling; inner berth is 500 ft long, and transit sheds are provided for each of 2 berths at quay wall.
Deep Water Harbour at Barbados
Dock Harbour Authority
1961
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1987
|Foundation of deep water quay in harbour of bakar
Engineering Index Backfile | 1968
|Elsevier | 1978
|Columns & Updates - Grids and Datums -- Barbados
Online Contents | 2007
Geodetic control on Barbados, West Indies
Online Contents | 2009
|