A platform for research: civil engineering, architecture and urbanism
40 tons on wood pile? Chicago engineers say 'yes'
Tests were conducted to determine safe working loads and ultimate load-carrying capacities of treated wood piles in Chicago vicinity; 12 in. butt diam oak, southern pine, and Douglas fir piles, Class A and B, were tested; test loads were applied by hydraulic jacks against anchored wide flange beam; piles withstood failure loads from 122 ton to 235 ton; in Chicago soil, required penetration per blow is reached in very tough and hard blue clays or dense silt.
40 tons on wood pile? Chicago engineers say 'yes'
Tests were conducted to determine safe working loads and ultimate load-carrying capacities of treated wood piles in Chicago vicinity; 12 in. butt diam oak, southern pine, and Douglas fir piles, Class A and B, were tested; test loads were applied by hydraulic jacks against anchored wide flange beam; piles withstood failure loads from 122 ton to 235 ton; in Chicago soil, required penetration per blow is reached in very tough and hard blue clays or dense silt.
40 tons on wood pile? Chicago engineers say 'yes'
Eng News-Rec
Engineering News-Record ; 165
1960
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Trucks pile 20,000 tons 20 feet deep
Engineering Index Backfile | 1942
Deep pile foundations in Chicago
Engineering Index Backfile | 1893
|3,000 tons of cast iron pipe being used for sewer construction in Chicago subway
Engineering Index Backfile | 1941
Engineering Index Backfile | 1951
Engineering Index Backfile | 1943
|