A platform for research: civil engineering, architecture and urbanism
Fort peck dam today -- V. spillway gates and channel paving
Design and construction of spillway, 9700 ft long, having capacity of 255,000 sec ft, with bottom width varying from 130 ft to 800 ft; steel erection; paving spillway; concrete placing.
Fort peck dam today -- V. spillway gates and channel paving
Design and construction of spillway, 9700 ft long, having capacity of 255,000 sec ft, with bottom width varying from 130 ft to 800 ft; steel erection; paving spillway; concrete placing.
Fort peck dam today -- V. spillway gates and channel paving
Eng News-Rec
Richardson, H.W. (author)
Engineering News-Record ; 117
1936
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Fort peck dam spillway construction
Engineering Index Backfile | 1936
|Analysis of the Fort Peck Spillway
British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1936
|Fort Peck Dam Spillway Modifications — Rock Anchors in Bearpaw Shale
British Library Conference Proceedings | 2017
|