A platform for research: civil engineering, architecture and urbanism
Description of spillway; boring 467 5-ft diam holes for concrete piles; cutting foundation shale with saws.
Description of spillway; boring 467 5-ft diam holes for concrete piles; cutting foundation shale with saws.
Fort peck dam spillway construction
Western Construction News
Hardin, H.R. (author)
1936
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Analysis of the Fort Peck Spillway
British Library Conference Proceedings | 1997
|Fort peck dam today -- V. spillway gates and channel paving
Engineering Index Backfile | 1936
|Fort Peck Dam Spillway Modifications — Rock Anchors in Bearpaw Shale
British Library Conference Proceedings | 2017
|ASCE | 2021
|