A platform for research: civil engineering, architecture and urbanism
Specification, quantities and estimates for precast concrete piling
Aug n 362 p 274, 276, 278, and 280: Estimates; bills of quantities; re-driving; estimates for precast pile driving; output analysis; head office control; bonus system. Oct n 364 p 340-342 and 344: Typical specification clauses for precast concrete pile driving; ground risks; supervision of pile sets; piling plant; stripping of piles; pile making; saving casting space; casting program; compensation for delays; lengthening of piles.
Specification, quantities and estimates for precast concrete piling
Aug n 362 p 274, 276, 278, and 280: Estimates; bills of quantities; re-driving; estimates for precast pile driving; output analysis; head office control; bonus system. Oct n 364 p 340-342 and 344: Typical specification clauses for precast concrete pile driving; ground risks; supervision of pile sets; piling plant; stripping of piles; pile making; saving casting space; casting program; compensation for delays; lengthening of piles.
Specification, quantities and estimates for precast concrete piling
Civ Eng (Lond)
Zinn, W.V. (author)
1936
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1948
Thirty-three miles of precast piling
Engineering Index Backfile | 1932
|Analysis of Precast Piles for Piling Process
Trans Tech Publications | 2013
|Analysis of Precast Piles for Piling Process
British Library Conference Proceedings | 2013
|Engineering Index Backfile | 1904