A platform for research: civil engineering, architecture and urbanism
Analysis of Precast Piles for Piling Process
This passage mainly studies the change of stress and penetration in the process of precast piling. According to the construction of guide bar diesel pile diver and the piling process of diesel pile driver in the reality, this passage analyses the stress and penetration in the process of precast piling practically and theoretically with the LS-DYNA module of the finite element software, ANSYS, before which the piling experiment has been done. And the conclusion will be reference in later engineering site.
Analysis of Precast Piles for Piling Process
This passage mainly studies the change of stress and penetration in the process of precast piling. According to the construction of guide bar diesel pile diver and the piling process of diesel pile driver in the reality, this passage analyses the stress and penetration in the process of precast piling practically and theoretically with the LS-DYNA module of the finite element software, ANSYS, before which the piling experiment has been done. And the conclusion will be reference in later engineering site.
Analysis of Precast Piles for Piling Process
Advanced Materials Research ; 748 ; 1079-1082
2013-08-30
4 pages
Article (Journal)
Electronic Resource
English
Analysis of Precast Piles for Piling Process
British Library Conference Proceedings | 2013
|Engineering Index Backfile | 1948
Development of a piling system of precast piles by applying rotary jet
Tema Archive | 1988
|Thirty-three miles of precast piling
Engineering Index Backfile | 1932
|