A platform for research: civil engineering, architecture and urbanism
Laminated timber frames form stockpile tunnels
Design and construction of three tunnels, 125 ft to 1350 ft long, for handling concrete aggregates at Grand Coulee Dam.
Laminated timber frames form stockpile tunnels
Design and construction of three tunnels, 125 ft to 1350 ft long, for handling concrete aggregates at Grand Coulee Dam.
Laminated timber frames form stockpile tunnels
Eng News Rec
Engineering News-Record ; 116
1936
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Laminated timber frames with composite fibre-reinforced connections
Online Contents | 2004
|Glass-fiber composite reinforced laminated timber frames under earthquake loads
Tema Archive | 2003
|Seismic performance of laminated timber frames with fiber-reinforced joints
Online Contents | 2004
|Wiley | 2023
|