A platform for research: civil engineering, architecture and urbanism
Lochaber water power scheme
Complete and collected description of scheme now working. May 8 n 4191 p 480-481: Geographical situation; preliminary work. May 15 n 4192 p 506-509: Ben Nevis tunnel; inlet and outlet portals; pipe line. May 22 n 4193 p 534-536: Laggan dam. May 29 n 4194 p 560-563: Construction of Laggan dam; siphons; concrete temperatures. June 5 n 4195 p 588-590: Laggan-Treig tunnel; tunnel portals; Treig dam; diversion of railway; conclusions.
Lochaber water power scheme
Complete and collected description of scheme now working. May 8 n 4191 p 480-481: Geographical situation; preliminary work. May 15 n 4192 p 506-509: Ben Nevis tunnel; inlet and outlet portals; pipe line. May 22 n 4193 p 534-536: Laggan dam. May 29 n 4194 p 560-563: Construction of Laggan dam; siphons; concrete temperatures. June 5 n 4195 p 588-590: Laggan-Treig tunnel; tunnel portals; Treig dam; diversion of railway; conclusions.
Lochaber water power scheme
Engineer
Engineer ; 161
1936
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1939
Engineering Index Backfile | 1933
Engineering Index Backfile | 1931
|The Lochaber water-power scheme
Engineering Index Backfile | 1930
|Lochaber hydro-electric scheme
Engineering Index Backfile | 1929