A platform for research: civil engineering, architecture and urbanism
Muskingum flood control works
Symposium on $34,500,000 flood-control and water-conservation project in eastern Ohio; Description of Project Works, E. L. WINSLOW, Jr.; History of Muskingum Project, C. C. CHAMBERS; Design of Muskingum Project, T. T. KNAPPEN; Design of Dams for Muskingum Project, A. L. ALIN; Hydraulic Models Prove Their Worth, G. E. BARNES and J. G. JOBES; Problems of Railroad Relocation, G. H. FRIEND; Relocation of Highways in District, C. E. McKEE; Public Utility Changes, O. W. GATCHELL; Construction and Control of Earth Dams, E. M. MOORE; Soil Mechanics Applied to Design of Dams, R. R. PHILIPPE.
Muskingum flood control works
Symposium on $34,500,000 flood-control and water-conservation project in eastern Ohio; Description of Project Works, E. L. WINSLOW, Jr.; History of Muskingum Project, C. C. CHAMBERS; Design of Muskingum Project, T. T. KNAPPEN; Design of Dams for Muskingum Project, A. L. ALIN; Hydraulic Models Prove Their Worth, G. E. BARNES and J. G. JOBES; Problems of Railroad Relocation, G. H. FRIEND; Relocation of Highways in District, C. E. McKEE; Public Utility Changes, O. W. GATCHELL; Construction and Control of Earth Dams, E. M. MOORE; Soil Mechanics Applied to Design of Dams, R. R. PHILIPPE.
Muskingum flood control works
Civ Eng
1936
28 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction starts soon on Muskingum flood-control dams
Engineering Index Backfile | 1934
|Muskingum Flood Routing Model With Multiple-Tributaries
British Library Conference Proceedings | 1996
|On the Muskingum-Cunge flood routing method
Online Contents | 1995
|River Flood Forecasting Using Complementary Muskingum Rating Equations
British Library Online Contents | 2009
|Analysis of Muskingum Equation Based Flood Routing Schemes
British Library Online Contents | 2000
|