A platform for research: civil engineering, architecture and urbanism
Outline of method by which steel towers are built at both ends of truss girders, and main steel ropes are stretched between them with vertical hangers fixed to them; first, cross beams are carried to place by cable way and are fixed to hangers; then various members are assembled in place; finally, trusses are closed at top chords, members riveted and towers and ropes removed. (In Japanese, with brief English abstract p 1)
Outline of method by which steel towers are built at both ends of truss girders, and main steel ropes are stretched between them with vertical hangers fixed to them; first, cross beams are carried to place by cable way and are fixed to hangers; then various members are assembled in place; finally, trusses are closed at top chords, members riveted and towers and ropes removed. (In Japanese, with brief English abstract p 1)
Erection of truss girders by "hanging" method
Japanese Gov Ry -- Bul
1935
40 pages
Article (Journal)
Japanese
© Metadata Copyright Elsevier B. V. All rights reserved.
S.F. Airport Roof Truss Erection
British Library Online Contents | 2000
|STABILITY OF CURVED I-GIRDERS DURING ERECTION
British Library Conference Proceedings | 2009
|Long erection spans with strengthened lattice girders
British Library Online Contents | 2011
|Cantilever erection of Truss bridge
Engineering Index Backfile | 1931
|