A platform for research: civil engineering, architecture and urbanism
Erection of tabata ohasi, all arc-welded highway bridge
Design, fabrication, erection and testing of all-welded plate-girder highway bridge, 135 m total length, including max span of 84-6 m; difficulties in field welding of joints and working of plates of 25 mm thickness as flange plates. (In Japanese, with brief English abstract p 1).
Erection of tabata ohasi, all arc-welded highway bridge
Design, fabrication, erection and testing of all-welded plate-girder highway bridge, 135 m total length, including max span of 84-6 m; difficulties in field welding of joints and working of plates of 25 mm thickness as flange plates. (In Japanese, with brief English abstract p 1).
Erection of tabata ohasi, all arc-welded highway bridge
Japanese Gov Ry -- Bul
1936
45 pages
2 Supp sheets
Article (Journal)
Japanese
© Metadata Copyright Elsevier B. V. All rights reserved.
Steel box girder erection device designed in highway bridge
European Patent Office | 2024
|Highway bridge girder erection machine high-place operation platform
European Patent Office | 2024
|UB Braunschweig | 1952
|Engineering Index Backfile | 1898
|