A platform for research: civil engineering, architecture and urbanism
Highway bridge girder erection machine high-place operation platform
The embodiment of the invention discloses a high-altitude operation platform of a highway bridge girder erection machine, which provides a good and stable operation place and a stable working environment for operators, so that potential safety hazards can be effectively reduced, and safety accidents are avoided. The device is characterized in that the left end and the right end of a main beam platform are connected with a first operation platform, the first operation platform is connected with a second operation platform, the second operation platform is connected with a third operation platform, the second operation platform is arranged above the first operation platform and the third operation platform, and the third operation platform is arranged above the first operation platform and the third operation platform. The axial pulley assembly is installed below the second operation platform, the radial pulley assembly is arranged on one side of the first operation platform, and a ladder stand assembly is arranged on the first operation platform and used for enabling workers to climb on the main beam platform conveniently.
本申请实施例公开了一种公路架桥机高处作业平台,为作业人员提供良好稳固的作业场所和稳定的工作环境,从而能够有效的减少安全隐患,避免安全事故的发生。本申请包括:所述主梁平台左右两端均与所述第一操作平台连接,所述第一操作平台与所述第二操作平台连接,所述第二操作平台与所述第三操作平台连接,所述第二操作平台设置在所述第一操作平台和所述第三操作平台的上方,所述第二操作平台的下方安装有所述轴向滑轮组件,所述第一操作平台的一侧设置有所述径向滑轮组件,所述第一操作平台上设置有爬梯组件,所述爬梯组件用于方便工作人员爬上所述主梁平台。
Highway bridge girder erection machine high-place operation platform
The embodiment of the invention discloses a high-altitude operation platform of a highway bridge girder erection machine, which provides a good and stable operation place and a stable working environment for operators, so that potential safety hazards can be effectively reduced, and safety accidents are avoided. The device is characterized in that the left end and the right end of a main beam platform are connected with a first operation platform, the first operation platform is connected with a second operation platform, the second operation platform is connected with a third operation platform, the second operation platform is arranged above the first operation platform and the third operation platform, and the third operation platform is arranged above the first operation platform and the third operation platform. The axial pulley assembly is installed below the second operation platform, the radial pulley assembly is arranged on one side of the first operation platform, and a ladder stand assembly is arranged on the first operation platform and used for enabling workers to climb on the main beam platform conveniently.
本申请实施例公开了一种公路架桥机高处作业平台,为作业人员提供良好稳固的作业场所和稳定的工作环境,从而能够有效的减少安全隐患,避免安全事故的发生。本申请包括:所述主梁平台左右两端均与所述第一操作平台连接,所述第一操作平台与所述第二操作平台连接,所述第二操作平台与所述第三操作平台连接,所述第二操作平台设置在所述第一操作平台和所述第三操作平台的上方,所述第二操作平台的下方安装有所述轴向滑轮组件,所述第一操作平台的一侧设置有所述径向滑轮组件,所述第一操作平台上设置有爬梯组件,所述爬梯组件用于方便工作人员爬上所述主梁平台。
Highway bridge girder erection machine high-place operation platform
一种公路架桥机高处作业平台
LU ZHICHEN (author) / HE SHEN (author) / ZHANG XINLAI (author) / WEI XIAN (author) / HUANG JUNQI (author) / WEI JIANG (author) / ZHOU CHAOHUI (author) / ZHANG MING (author) / LI QINGBIN (author) / QIN JIXING (author)
2024-03-12
Patent
Electronic Resource
Chinese
Attached type safe operation platform of highway bridge girder erection machine
European Patent Office | 2024
|Frame type safe operation platform of highway bridge girder erection machine
European Patent Office | 2024
|Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
European Patent Office | 2024
|Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
European Patent Office | 2024
|European Patent Office | 2024
|