Analysis of delays in Tanzanian construction industry
Transaction cost economics (TCE) and structural equation modeling (SEM) approach
The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM).
This study was conducted in the construction industry in Tanzania. A questionnaire-based survey method was used. A total of 308 respondents participated in the study. The relationships between the cause and effect factors were analyzed using SEM.
The important findings are as follows:cost overrun can be explained by consultant-related and material-related factors; disputes can be explained by cost overrun; arbitration can be explained by consultant-related, cost overrun, and dispute factors; litigation can be explained by client-related, disputes, and arbitration factors; and abandonment can be explained by consultant-related, external-related, disputes, arbitration, and litigation factors.
The main contributions of this study are theoretical development and comprehensive analyses of “cause” and “effect” factors of delays in the construction industry.
Analysis of delays in Tanzanian construction industry
Transaction cost economics (TCE) and structural equation modeling (SEM) approach
The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM).
This study was conducted in the construction industry in Tanzania. A questionnaire-based survey method was used. A total of 308 respondents participated in the study. The relationships between the cause and effect factors were analyzed using SEM.
The important findings are as follows:cost overrun can be explained by consultant-related and material-related factors; disputes can be explained by cost overrun; arbitration can be explained by consultant-related, cost overrun, and dispute factors; litigation can be explained by client-related, disputes, and arbitration factors; and abandonment can be explained by consultant-related, external-related, disputes, arbitration, and litigation factors.
The main contributions of this study are theoretical development and comprehensive analyses of “cause” and “effect” factors of delays in the construction industry.
Analysis of delays in Tanzanian construction industry
Transaction cost economics (TCE) and structural equation modeling (SEM) approach
TCE and SEM approach
Sambasivan, Murali (author) / Deepak, T.J. (author) / Salim, Ali Nasoor (author) / Ponniah, Venishri (author)
Engineering, Construction and Architectural Management ; 24 ; 308-325
2017-03-20
18 pages
Article (Journal)
Electronic Resource
English
Analysis of delays in Tanzanian construction industry
Online Contents | 2017
|British Library Online Contents | 2010
|DELAYS IN CONSTRUCTION INDUSTRY
British Library Conference Proceedings | 2005
|Analysis of Concurrent Delays in the Construction Industry
Springer Verlag | 2022
|