Analysis of delays in Tanzanian construction industry
Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM). Design/methodology/approach This study was conducted in the construction industry in Tanzania. A questionnaire-based survey method was used. A total of 308 respondents participated in the study. The relationships between the cause and effect factors were analyzed using SEM. Findings The important findings are as follows:cost overrun can be explained by consultant-related and material-related factors; disputes can be explained by cost overrun; arbitration can be explained by consultant-related, cost overrun, and dispute factors; litigation can be explained by client-related, disputes, and arbitration factors; and abandonment can be explained by consultant-related, external-related, disputes, arbitration, and litigation factors. Originality/value The main contributions of this study are theoretical development and comprehensive analyses of "cause" and "effect" factors of delays in the construction industry.
Analysis of delays in Tanzanian construction industry
Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM). Design/methodology/approach This study was conducted in the construction industry in Tanzania. A questionnaire-based survey method was used. A total of 308 respondents participated in the study. The relationships between the cause and effect factors were analyzed using SEM. Findings The important findings are as follows:cost overrun can be explained by consultant-related and material-related factors; disputes can be explained by cost overrun; arbitration can be explained by consultant-related, cost overrun, and dispute factors; litigation can be explained by client-related, disputes, and arbitration factors; and abandonment can be explained by consultant-related, external-related, disputes, arbitration, and litigation factors. Originality/value The main contributions of this study are theoretical development and comprehensive analyses of "cause" and "effect" factors of delays in the construction industry.
Analysis of delays in Tanzanian construction industry
Murali Sambasivan (author) / TJ Deepak / Ali Nasoor Salim / Venishri Ponniah
2017
Article (Journal)
English
BKL:
56.00
Bauwesen: Allgemeines
Analysis of delays in Tanzanian construction industry
Emerald Group Publishing | 2017
|British Library Online Contents | 2010
|DELAYS IN CONSTRUCTION INDUSTRY
British Library Conference Proceedings | 2005
|Analysis of Concurrent Delays in the Construction Industry
Springer Verlag | 2022
|