A platform for research: civil engineering, architecture and urbanism
The present invention is directed to a precast headwall unit for discharging water from a pipe to a waterway. The precast headwall unit has two back walls that serve to increase the integrity of the precast headwall unit and pipe coupling and 5 avoid the need for additional formwork during installation. The invention also covers retrofitting headwalls and culverts with a second back wall. Figure 1 1<7(3
The present invention is directed to a precast headwall unit for discharging water from a pipe to a waterway. The precast headwall unit has two back walls that serve to increase the integrity of the precast headwall unit and pipe coupling and 5 avoid the need for additional formwork during installation. The invention also covers retrofitting headwalls and culverts with a second back wall. Figure 1 1<7(3
Precast headwall unit
THOMAS PHIL (author)
2016-11-17
Patent
Electronic Resource
English
PRECAST CONCRETE BRIDGE UNIT AND HEADWALL ASSEMBLY AND METHOD OF PRODUCTION
European Patent Office | 2016
|PRECAST CONCRETE BRIDGE UNIT AND HEADWALL ASSEMBLY AND METHOD OF PRODUCTION
European Patent Office | 2016
|Precast concrete bridge unit and headwall assembly and method of production
European Patent Office | 2017
|PRECAST CONCRETE BRIDGE UNIT AND HEADWALL ASSEMBLY AND METHOD OF PRODUCTION
European Patent Office | 2018
|