A platform for research: civil engineering, architecture and urbanism
PRECAST CONCRETE BRIDGE UNIT AND HEADWALL ASSEMBLY AND METHOD OF PRODUCTION
A method of producing a precast concrete bridge and headwall assembly including casting a reinforced concrete bridge unit having a top wall connecting opposite side walls; positioning the bridge unit with a first side supported by a horizontal casting surface, wherein the top wall is positioned adjacent a framing unit for the headwall; forming a precast concrete headwall on the casting surface adjacent the top wall with a series of earth anchors at laterally spaced intervals along the top wall between the side walls, each earth anchor formed with: a) a body member extending outward from the headwall to the top wall; and b) a foot member extending laterally outward from the body member engaged on the top wall and including an upper surface generally parallel to the top wall; and removing the headwall and earth anchors as a unit from the bridge unit.
PRECAST CONCRETE BRIDGE UNIT AND HEADWALL ASSEMBLY AND METHOD OF PRODUCTION
A method of producing a precast concrete bridge and headwall assembly including casting a reinforced concrete bridge unit having a top wall connecting opposite side walls; positioning the bridge unit with a first side supported by a horizontal casting surface, wherein the top wall is positioned adjacent a framing unit for the headwall; forming a precast concrete headwall on the casting surface adjacent the top wall with a series of earth anchors at laterally spaced intervals along the top wall between the side walls, each earth anchor formed with: a) a body member extending outward from the headwall to the top wall; and b) a foot member extending laterally outward from the body member engaged on the top wall and including an upper surface generally parallel to the top wall; and removing the headwall and earth anchors as a unit from the bridge unit.
PRECAST CONCRETE BRIDGE UNIT AND HEADWALL ASSEMBLY AND METHOD OF PRODUCTION
VON HANDORF JEFFREY J (author) / NICHOLSON TOMMY E (author)
2018-02-08
Patent
Electronic Resource
English
IPC:
E01D
BRIDGES
,
Brücken
/
B29C
Formen oder Verbinden von Kunststoffen
,
SHAPING OR JOINING OF PLASTICS
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
PRECAST CONCRETE BRIDGE UNIT AND HEADWALL ASSEMBLY AND METHOD OF PRODUCTION
European Patent Office | 2016
|PRECAST CONCRETE BRIDGE UNIT AND HEADWALL ASSEMBLY AND METHOD OF PRODUCTION
European Patent Office | 2016
|Precast concrete bridge unit and headwall assembly and method of production
European Patent Office | 2017
|