A platform for research: civil engineering, architecture and urbanism
PROCESS FOR INSTALLING AN OFFSHORE TOWER
Process for installing an offshore tower including telescopic shaft and tower foundation, said shaft comprising a base section and at least two expandable superposition sections, comprising: a) manufacturing a foundation block, at least one superposition section, and the base section; b) applying base section to foundation block (thus forming a starting unit), superposition sections to starting unit, and lifting means to foundation block and/or base section; c) moving starting unit up to the installation point; d) ballasting foundation block so that starting unit sinks; e) actuating lifting means to expand sections; f) between steps a) and c), placing foundation block or starting unit in the body of water. In d), sinking is assisted by auxiliary self-buoyant structure comprising guiding means linked to base section. Said auxiliary self-buoyant structure and guiding means do not contribute to the floatability of said base section during step d).
L'invention porte sur un procédé pour installer une tour en mer, lequel procédé met en uvre : a) la fabrication d'une fondation comprenant un bloc (1, 1'), la fabrication d'au moins une section de superposition d'un puits (7), et la fabrication d'une section de base (25) d'un puits ; b) l'application de ladite section de base audit bloc de fondation (unité de départ) pour prendre la position relative pour la condition installée, l'application desdites sections de superposition à ladite unité de départ sous une configuration multicouche, et l'application de moyens de levage audit bloc de fonction et/ou à ladite section de base ; c) le déplacement de ladite unité de départ jusqu'au point d'installation ; d) l'introduction de ballast dans ledit bloc de fondation de telle sorte que ladite unité de départ plonge jusqu'à reposer sur le fond du corps d'eau ; e) l'actionnement desdits moyens de levage pour étendre lesdites sections dans la condition installée ; f) entre les étapes a) et c), la disposition dudit bloc de fondation ou de ladite unité de départ dans le corps d'eau du point d'installation.
PROCESS FOR INSTALLING AN OFFSHORE TOWER
Process for installing an offshore tower including telescopic shaft and tower foundation, said shaft comprising a base section and at least two expandable superposition sections, comprising: a) manufacturing a foundation block, at least one superposition section, and the base section; b) applying base section to foundation block (thus forming a starting unit), superposition sections to starting unit, and lifting means to foundation block and/or base section; c) moving starting unit up to the installation point; d) ballasting foundation block so that starting unit sinks; e) actuating lifting means to expand sections; f) between steps a) and c), placing foundation block or starting unit in the body of water. In d), sinking is assisted by auxiliary self-buoyant structure comprising guiding means linked to base section. Said auxiliary self-buoyant structure and guiding means do not contribute to the floatability of said base section during step d).
L'invention porte sur un procédé pour installer une tour en mer, lequel procédé met en uvre : a) la fabrication d'une fondation comprenant un bloc (1, 1'), la fabrication d'au moins une section de superposition d'un puits (7), et la fabrication d'une section de base (25) d'un puits ; b) l'application de ladite section de base audit bloc de fondation (unité de départ) pour prendre la position relative pour la condition installée, l'application desdites sections de superposition à ladite unité de départ sous une configuration multicouche, et l'application de moyens de levage audit bloc de fonction et/ou à ladite section de base ; c) le déplacement de ladite unité de départ jusqu'au point d'installation ; d) l'introduction de ballast dans ledit bloc de fondation de telle sorte que ladite unité de départ plonge jusqu'à reposer sur le fond du corps d'eau ; e) l'actionnement desdits moyens de levage pour étendre lesdites sections dans la condition installée ; f) entre les étapes a) et c), la disposition dudit bloc de fondation ou de ladite unité de départ dans le corps d'eau du point d'installation.
PROCESS FOR INSTALLING AN OFFSHORE TOWER
PROCEDE POUR INSTALLER UNE TOUR EN MER
FERNANDEZ GOMEZ MIGUEL ANGEL (author) / JIMENO CHUECA JOSE EMILIO (author)
2020-08-11
Patent
Electronic Resource
English