A platform for research: civil engineering, architecture and urbanism
PROCESS FOR INSTALLING AN OFFSHORE TOWER
Process for installing an offshore tower, specifically a substructure, which basically comprises the following steps: a) dry manufacturing a foundation comprising a block (1, 1′) basically made of concrete and dry manufacturing a base section (25) of a shaft (2); b) applying said base section to said foundation block, forming a unit called the “starting unit”; c) moving said starting unit to the installation point of said substructure; and d) actuating in a controlled manner, first ballast valve means in such a manner that said starting unit sinks until resting on the seabed; having placed said foundation block or said starting unit in the body of water where the installation point said substructure is located.
PROCESS FOR INSTALLING AN OFFSHORE TOWER
Process for installing an offshore tower, specifically a substructure, which basically comprises the following steps: a) dry manufacturing a foundation comprising a block (1, 1′) basically made of concrete and dry manufacturing a base section (25) of a shaft (2); b) applying said base section to said foundation block, forming a unit called the “starting unit”; c) moving said starting unit to the installation point of said substructure; and d) actuating in a controlled manner, first ballast valve means in such a manner that said starting unit sinks until resting on the seabed; having placed said foundation block or said starting unit in the body of water where the installation point said substructure is located.
PROCESS FOR INSTALLING AN OFFSHORE TOWER
VERFAHREN ZUR INSTALLATION EINES OFFSHORE-TURMS
PROCÉDÉ D'INSTALLATION DE TOUR EN MER
FERNÁNDEZ GÓMEZ MIGUEL ÁNGEL (author) / JIMENO CHUECA JOSÉ EMILIO (author)
2019-06-26
Patent
Electronic Resource
English