A platform for research: civil engineering, architecture and urbanism
METHOD FOR INSTALLING METAL PILES IN PERMAFROST SOIL
CA 02942801 2016-09-14 ABSTRACT A method for installing driven cast-in-situ supports of pipes, power transmission towers, and in the mounting of buildings and structures on permafrost soils excludes the ingress of slurry and groundwater into the hole when installing driven cast-in-situ piles in permafrost soils in summer having a thawed seasonal freezing and thawing layer while avoiding the impact of frost heaving forces of soil from seasonal freezing conditions. The method includes driving a casing pipe at a depth of seasonal freezing and thawing of soil, drilling a pilot hole at a depth of not less than the depth of seasonal freezing and thawing of the soil, pouring hardening material in the amount required to fill in the space between the pilot hole walls and the pile from the bottom of the pilot hole to the bottom of seasonal freezing and thawing soil layer, installation of the pile in the pilot hole and poured mortar, and filling the remaining space between the pile and the casing pipe with non-frost heaving loose inert material.
L'invention se rapporte à la construction de fondations et peut être utilisée lors de la construction de supports sur pilotis de conduits, de supports de lignes de transmission d'électricité, ainsi que lors de la construction de bâtiments et de structures sur des pergélisols. Le but de l'invention est d'élaborer des techniques de montage de pylônes permettant d'exclure toute possibilité de chute dans le puits de boues du sol et d'eaux de ruissellement lors de la menée des travaux lors de la construction de pylônes sur pilotis dans des pergélisols en période estivale dans des sols inondés de la couche de gel-fonte saisonniers, et d'exclure toute possibilité d'action des forces de soulèvement par le gel qui sont dues à la déformation par soulèvement dans des conditions de gel saisonnier. Le procédé consiste à enfoncer un coffrage à la profondeur de gel-fonte saisonniers du sol, à forer un puits de tête à une profondeur au moins égale à la profondeur normative de gel du sol, à couler un matériau durcissable dans le volume nécessaire pour remplir la cavité entre le puits de tête et le pylône depuis le fond du puits de tête jusqu'au bas du niveau de la couche de gel-fonte saisonniers du sol, à descendre le pylône, à remplir la cavité entre le pylône et le coffrage avec un matériau neutre en vrac et non gonflant.
METHOD FOR INSTALLING METAL PILES IN PERMAFROST SOIL
CA 02942801 2016-09-14 ABSTRACT A method for installing driven cast-in-situ supports of pipes, power transmission towers, and in the mounting of buildings and structures on permafrost soils excludes the ingress of slurry and groundwater into the hole when installing driven cast-in-situ piles in permafrost soils in summer having a thawed seasonal freezing and thawing layer while avoiding the impact of frost heaving forces of soil from seasonal freezing conditions. The method includes driving a casing pipe at a depth of seasonal freezing and thawing of soil, drilling a pilot hole at a depth of not less than the depth of seasonal freezing and thawing of the soil, pouring hardening material in the amount required to fill in the space between the pilot hole walls and the pile from the bottom of the pilot hole to the bottom of seasonal freezing and thawing soil layer, installation of the pile in the pilot hole and poured mortar, and filling the remaining space between the pile and the casing pipe with non-frost heaving loose inert material.
L'invention se rapporte à la construction de fondations et peut être utilisée lors de la construction de supports sur pilotis de conduits, de supports de lignes de transmission d'électricité, ainsi que lors de la construction de bâtiments et de structures sur des pergélisols. Le but de l'invention est d'élaborer des techniques de montage de pylônes permettant d'exclure toute possibilité de chute dans le puits de boues du sol et d'eaux de ruissellement lors de la menée des travaux lors de la construction de pylônes sur pilotis dans des pergélisols en période estivale dans des sols inondés de la couche de gel-fonte saisonniers, et d'exclure toute possibilité d'action des forces de soulèvement par le gel qui sont dues à la déformation par soulèvement dans des conditions de gel saisonnier. Le procédé consiste à enfoncer un coffrage à la profondeur de gel-fonte saisonniers du sol, à forer un puits de tête à une profondeur au moins égale à la profondeur normative de gel du sol, à couler un matériau durcissable dans le volume nécessaire pour remplir la cavité entre le puits de tête et le pylône depuis le fond du puits de tête jusqu'au bas du niveau de la couche de gel-fonte saisonniers du sol, à descendre le pylône, à remplir la cavité entre le pylône et le coffrage avec un matériau neutre en vrac et non gonflant.
METHOD FOR INSTALLING METAL PILES IN PERMAFROST SOIL
PROCEDE DE MONTAGE DE PYLONES METALLIQUES DANS LES PERGELISOLS
SMIRNOV NIKOLAI VLADIMIROVICH (author) / KUMALLAGOV VITALY ALEKSANDROVICH (author) / SEMIN EVGENII EVGENIEVICH (author) / IVAKIN ALEKSANDR VLADIMIROVICH (author) / BOGATENKOV YURY VASILEVICH (author) / SAPSAY ALEXEY NIKOLAEVICH (author)
2021-05-25
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
Gründungen