A platform for research: civil engineering, architecture and urbanism
Road inspection well and construction method thereof
The invention relates to a road inspection well and a construction method thereof. The road inspection well comprises a well lid, a well seat and a shaft. The well seat is coaxially fixedly mounted at the upper end of the shaft. The well lid is coaxially mounted on the well seat. An asphalt road surface is disposed on the upper portion of the top surface of the shaft. The well seat is disposed in the asphalt road surface. The top surface of the well lid is parallel with the asphalt road surface. The shaft is of a reinforced concrete structure, that is to say, a reinforcement cage is disposed in the shaft, and bolts are coaxially and evenly pre-buried in the wall of the shaft at intervals. The pre-buried bolts penetrate the nut holes of the well seat and fixedly connected by nuts. The road inspection well has the advantages that the shaft below the well lid is made of reinforced concrete, the bolts are pre-buried in the shaft, the well seat and the shaft are fixedly and integrally connected by the bolts, and cracks between the periphery of the well lid and the road surface are avoided effectively.
Road inspection well and construction method thereof
The invention relates to a road inspection well and a construction method thereof. The road inspection well comprises a well lid, a well seat and a shaft. The well seat is coaxially fixedly mounted at the upper end of the shaft. The well lid is coaxially mounted on the well seat. An asphalt road surface is disposed on the upper portion of the top surface of the shaft. The well seat is disposed in the asphalt road surface. The top surface of the well lid is parallel with the asphalt road surface. The shaft is of a reinforced concrete structure, that is to say, a reinforcement cage is disposed in the shaft, and bolts are coaxially and evenly pre-buried in the wall of the shaft at intervals. The pre-buried bolts penetrate the nut holes of the well seat and fixedly connected by nuts. The road inspection well has the advantages that the shaft below the well lid is made of reinforced concrete, the bolts are pre-buried in the shaft, the well seat and the shaft are fixedly and integrally connected by the bolts, and cracks between the periphery of the well lid and the road surface are avoided effectively.
Road inspection well and construction method thereof
ZHANG TINGYOU (author) / FU XIANGCAI (author) / QIN LIN (author) / ZHANG KUI (author) / WAN ZHONGZHENG (author) / GAO ZHENGQIANG (author) / YANG XIANGUI (author) / SONG SHUQIANG (author) / ZHU SHAOHUA (author) / WANG XIANCHUN (author)
2015-04-08
Patent
Electronic Resource
English
Road inspection well structure and construction method thereof
European Patent Office | 2023
|Municipal road inspection well and construction method thereof
European Patent Office | 2022
|Road inspection well and manufacturing process and construction method thereof
European Patent Office | 2020
|Municipal road inspection well structure and installation and construction method thereof
European Patent Office | 2022
|