Extra-large karst cave bottom treatment construction method
The invention belongs to the technical field of tunnel traversing extra-large karst cave construction, aims at solving the problem that an existing foundation construction method cannot be suitable for extra-large karst caves and provides an extra-large karst cave bottom treatment construction method. A pipe-following drilling process is adopted to synchronously follow a sleeve in the drilling process, the sleeve penetrates through an easily-collapsed stratum to partition the easily-collapsed stratum, the pipe-following drilling is stopped at the karst cave position, then fine aggregate concrete is adopted for backfill, and continuous drilling is completed after backfill is completed. Working efficiency is greatly improved, cost is reduced, and time is saved. The pipe-following drilling process is effective compared with construction of the easily-collapsed stratum and can be universally applied to slope protection under similar geological conditions and foundation base reinforcement treatment projects. A full-automatic casting recording instrument is adopted for recoding, treatment is timely performed in an intermittent or slurry mixture ratio adjusting mode if one-single casting amount is too large or no pressure exists for long time, meanwhile the requirements for casting pressure and casting amount are ensured, and casting reinforcement effect is ensured.
Extra-large karst cave bottom treatment construction method
The invention belongs to the technical field of tunnel traversing extra-large karst cave construction, aims at solving the problem that an existing foundation construction method cannot be suitable for extra-large karst caves and provides an extra-large karst cave bottom treatment construction method. A pipe-following drilling process is adopted to synchronously follow a sleeve in the drilling process, the sleeve penetrates through an easily-collapsed stratum to partition the easily-collapsed stratum, the pipe-following drilling is stopped at the karst cave position, then fine aggregate concrete is adopted for backfill, and continuous drilling is completed after backfill is completed. Working efficiency is greatly improved, cost is reduced, and time is saved. The pipe-following drilling process is effective compared with construction of the easily-collapsed stratum and can be universally applied to slope protection under similar geological conditions and foundation base reinforcement treatment projects. A full-automatic casting recording instrument is adopted for recoding, treatment is timely performed in an intermittent or slurry mixture ratio adjusting mode if one-single casting amount is too large or no pressure exists for long time, meanwhile the requirements for casting pressure and casting amount are ensured, and casting reinforcement effect is ensured.
Extra-large karst cave bottom treatment construction method
MA LIANG (author) / ZHANG BOXUAN (author) / SONG GUOYING (author) / WANG BO (author)
2015-04-22
Patent
Electronic Resource
English
Construction treatment method for extra-large karst cave pile foundation
European Patent Office | 2024
|Tunnel bottom reinforcement treatment method for tunnel crossing large filling karst cave
European Patent Office | 2024
|Comprehensive treatment construction method for tunnel crossing large karst cave
European Patent Office | 2024
|