Intra-tunnel elastic support block type ballastless track dual-line construction process
The invention provides an intra-tunnel elastic support block type ballastless track dual-line construction process which comprises the process flow as follows: preparation of construction; installation of ballast bed bottom plate steel bars; track panel assembling; track panel paving; installation of upper-layer steel bars; coarse adjustment; steel bar insulation test; template installation; fine adjustment; concrete pouring; concrete-face closure; track panel rack disassembly and accessory clearing; ballast bed concrete curing. Polyethylene foam sheets or foam plastic sheets are adopted for settlement joints, and the surface is sealed by use of bituminous cement. The ballast bed concrete curing period is not less than 14 days. According to the intra-tunnel elastic support block type ballastless track dual-line construction process, the purposes of optimizing resource allocation and quickening the construction progress are achieved; the ballastless track construction quality and progress are ensured, and procedural and normalized operation and management are convenient.
Intra-tunnel elastic support block type ballastless track dual-line construction process
The invention provides an intra-tunnel elastic support block type ballastless track dual-line construction process which comprises the process flow as follows: preparation of construction; installation of ballast bed bottom plate steel bars; track panel assembling; track panel paving; installation of upper-layer steel bars; coarse adjustment; steel bar insulation test; template installation; fine adjustment; concrete pouring; concrete-face closure; track panel rack disassembly and accessory clearing; ballast bed concrete curing. Polyethylene foam sheets or foam plastic sheets are adopted for settlement joints, and the surface is sealed by use of bituminous cement. The ballast bed concrete curing period is not less than 14 days. According to the intra-tunnel elastic support block type ballastless track dual-line construction process, the purposes of optimizing resource allocation and quickening the construction progress are achieved; the ballastless track construction quality and progress are ensured, and procedural and normalized operation and management are convenient.
Intra-tunnel elastic support block type ballastless track dual-line construction process
SONG ZHAOSHANG (author) / ZHOU DABING (author) / ZHANG ZHONGYAO (author) / YE GUOCANG (author)
2015-07-15
Patent
Electronic Resource
English
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Tunnel boot sleeving method replaceable supporting block ballastless track construction method
European Patent Office | 2020
|European Patent Office | 2023
|Self-compacting concrete for elastic supporting block type ballastless track bed
European Patent Office | 2022
|Large-adjustment supporting block type ballastless track
European Patent Office | 2023
|