A platform for research: civil engineering, architecture and urbanism
Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
The invention discloses an operation platform for prefabricated assembled residential building wall plate construction and a construction method thereof. The operation platform comprises a base and a platform plate, wherein the platform plate is fixedly arranged on the base through an upright post, a railing is arranged on the platform plate, a wall plate fixing device is arranged on the railing, and the wall plate fixing device comprises a distance regulating rod, a first locking element and a second locking element. The construction method comprises the following steps that a prefabricated wall plate is manufactured, and the prefabricated wall plate is conveyed to a construction site; the operation platform is put in a building house; the wall plate is hung and put in a specified position, in addition, the perpendicularity of the wall plate is corrected, and meanwhile, the wall plate is temporarily fixed through the wall plate fixing device arranged on the operation platform; the integral connection of the wall plate and a wall plate seam is carried out; the operation platform is hung away and is put into another building house for sequentially completing the wall plate installation. The operation platform provided by the invention has the advantages that the wall plate hanging construction difficulty is reduced, and the time and the labor are saved. Meanwhile, the construction method provided by the invention has the advantages that the construction efficiency is improved, and the construction period is shortened.
Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
The invention discloses an operation platform for prefabricated assembled residential building wall plate construction and a construction method thereof. The operation platform comprises a base and a platform plate, wherein the platform plate is fixedly arranged on the base through an upright post, a railing is arranged on the platform plate, a wall plate fixing device is arranged on the railing, and the wall plate fixing device comprises a distance regulating rod, a first locking element and a second locking element. The construction method comprises the following steps that a prefabricated wall plate is manufactured, and the prefabricated wall plate is conveyed to a construction site; the operation platform is put in a building house; the wall plate is hung and put in a specified position, in addition, the perpendicularity of the wall plate is corrected, and meanwhile, the wall plate is temporarily fixed through the wall plate fixing device arranged on the operation platform; the integral connection of the wall plate and a wall plate seam is carried out; the operation platform is hung away and is put into another building house for sequentially completing the wall plate installation. The operation platform provided by the invention has the advantages that the wall plate hanging construction difficulty is reduced, and the time and the labor are saved. Meanwhile, the construction method provided by the invention has the advantages that the construction efficiency is improved, and the construction period is shortened.
Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
ZHANG YUSHAN (author)
2015-07-15
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Residential building prefabricated balcony construction method
European Patent Office | 2020
|Multifunctional prefabricated assembled building construction fence and construction method thereof
European Patent Office | 2015
|Prefabricated plate and prefabricated wall joint and construction method thereof
European Patent Office | 2016
|Assembled prefabricated wall concrete slab and construction method thereof
European Patent Office | 2021
|