Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
The invention discloses a hydraulic climbing formwork structure and a construction method of the hydraulic climbing formwork structure. A main body structure at least comprises first construction spaces and second construction spaces, wherein a hydraulic climbing device is arranged in each first construction space. A construction method of the second spaces comprises the following steps that: hydraulic climbing frames are arranged on the hydraulic climbing devices arranged in the first construction spaces; outrigger trusses crossing over the second construction spaces are built on the tops of the hydraulic climbing frames; and construction equipment used for constructing the second construction spaces is hung on the outrigger trusses. The outrigger trusses are erected through the hydraulic climbing devices arranged in the first construction spaces in the main body structure; the construction equipment such as structure formwork and operation platforms for constructing the second construction spaces are hung on the outrigger trusses; the hydraulic climbing devices arranged in the first construction spaces are used for synchronously lifting the construction equipment in the second construction spaces; the implementation of hydraulic climbing formwork construction in the second construction spaces in which the hydraulic climbing devices cannot be installed can be achieved; and the synchronous climbing of inner and outer structure formwork of the second construction spaces is achieved.
Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
The invention discloses a hydraulic climbing formwork structure and a construction method of the hydraulic climbing formwork structure. A main body structure at least comprises first construction spaces and second construction spaces, wherein a hydraulic climbing device is arranged in each first construction space. A construction method of the second spaces comprises the following steps that: hydraulic climbing frames are arranged on the hydraulic climbing devices arranged in the first construction spaces; outrigger trusses crossing over the second construction spaces are built on the tops of the hydraulic climbing frames; and construction equipment used for constructing the second construction spaces is hung on the outrigger trusses. The outrigger trusses are erected through the hydraulic climbing devices arranged in the first construction spaces in the main body structure; the construction equipment such as structure formwork and operation platforms for constructing the second construction spaces are hung on the outrigger trusses; the hydraulic climbing devices arranged in the first construction spaces are used for synchronously lifting the construction equipment in the second construction spaces; the implementation of hydraulic climbing formwork construction in the second construction spaces in which the hydraulic climbing devices cannot be installed can be achieved; and the synchronous climbing of inner and outer structure formwork of the second construction spaces is achieved.
Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
XI JINLE (author) / YANG XUEBING (author) / ZHANG HONGJIAN (author) / LI LEI (author) / CAO HAILIANG (author)
2015-08-19
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Hydraulic climbing formwork and climbing formwork construction method