A platform for research: civil engineering, architecture and urbanism
Flue structure and mounting construction method thereof
The invention discloses a flue structure and a mounting construction method thereof. The method comprises steps as follows: 1), a flue mounting hole is correspondingly reserved in a floor plate on each floor, flanging is arranged on the hole edge at the top of each flue mounting hole, a preformed groove is formed in the hole edge at the bottom of each flue mounting hole, the flue mounting hole, the flanging, the preformed groove and a main body structure of each floor are formed through one-time pouring, and the shape and the size of each flue mounting hole are identical to the inner cross-sectional shape and size of a to-be-mounted flue; 2), each flue is vertically placed on the corresponding floor plate, then, the flue is pushed to the corresponding flanging, and the inner wall of the flue is flush with the inner wall of the corresponding flue mounting hole; 3), the top of each flue is ejected into the preformed groove in the bottom of the flue mounting hole of the corresponding upper floor plate, and a cushion block is placed at the bottom of the flue; 4), fine aggregate concrete is poured in a gap between the outer side of the bottom of the corresponding flue and the outer wall of the flanging, and heightened flanging is formed; 5), each preformed groove is filled with cement mortar. The construction procedure is simplified, the construction cost is saved, the leakage risk is reduced, and the construction quality is improved.
Flue structure and mounting construction method thereof
The invention discloses a flue structure and a mounting construction method thereof. The method comprises steps as follows: 1), a flue mounting hole is correspondingly reserved in a floor plate on each floor, flanging is arranged on the hole edge at the top of each flue mounting hole, a preformed groove is formed in the hole edge at the bottom of each flue mounting hole, the flue mounting hole, the flanging, the preformed groove and a main body structure of each floor are formed through one-time pouring, and the shape and the size of each flue mounting hole are identical to the inner cross-sectional shape and size of a to-be-mounted flue; 2), each flue is vertically placed on the corresponding floor plate, then, the flue is pushed to the corresponding flanging, and the inner wall of the flue is flush with the inner wall of the corresponding flue mounting hole; 3), the top of each flue is ejected into the preformed groove in the bottom of the flue mounting hole of the corresponding upper floor plate, and a cushion block is placed at the bottom of the flue; 4), fine aggregate concrete is poured in a gap between the outer side of the bottom of the corresponding flue and the outer wall of the flanging, and heightened flanging is formed; 5), each preformed groove is filled with cement mortar. The construction procedure is simplified, the construction cost is saved, the leakage risk is reduced, and the construction quality is improved.
Flue structure and mounting construction method thereof
JIA ZUOMING (author) / XIAO ZHENGDUO (author) / WANG CHU (author) / PENG FEI (author) / XIE BIN (author) / ZHONG JIAXIANG (author)
2015-09-30
Patent
Electronic Resource
English
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Flue, flue mounting auxiliary tool, using method of flue mounting auxiliary tool and flue system
European Patent Office | 2021
|Novel residential flue gas pipeline structure and mounting method thereof
European Patent Office | 2021
|Mounting mold of building flue system and construction method of mounting mold
European Patent Office | 2022
|