A platform for research: civil engineering, architecture and urbanism
The invention relates to a corridor bridge apparatus which solves the technical problems of the prior art, for instance, a current corridor bridge takes a long period to complete, is high in construction cost, requires high maintenance and withstands shake not so desirably. The corridor bridge apparatus comprises a reinforced bar and concrete made flat plate bridge, a left side corridor room set and a right side corridor room set. The reinforced bar and concrete made flat plate bridge comprises a vehicle bridge body in the middle, a left pedestrian bridge body, and a right pedestrian bridge body. The two ends and the middle part of the left pedestrian bridge body are vertically connected to a bridge base group respectively. The two ends and the middle part of the right pedestrian bridge body are vertically connected to a bridge base group. The bridge base group consists of two bridge bases arranged side by side. The left side corridor room is connected with the left pedestrian bridge body; the right side corridor room is connected with the right pedestrian bridge body. Between the left side corridor room and the right side corridor room is a sky corridor. The apparatus is widely used in various corridor bridges.
The invention relates to a corridor bridge apparatus which solves the technical problems of the prior art, for instance, a current corridor bridge takes a long period to complete, is high in construction cost, requires high maintenance and withstands shake not so desirably. The corridor bridge apparatus comprises a reinforced bar and concrete made flat plate bridge, a left side corridor room set and a right side corridor room set. The reinforced bar and concrete made flat plate bridge comprises a vehicle bridge body in the middle, a left pedestrian bridge body, and a right pedestrian bridge body. The two ends and the middle part of the left pedestrian bridge body are vertically connected to a bridge base group respectively. The two ends and the middle part of the right pedestrian bridge body are vertically connected to a bridge base group. The bridge base group consists of two bridge bases arranged side by side. The left side corridor room is connected with the left pedestrian bridge body; the right side corridor room is connected with the right pedestrian bridge body. Between the left side corridor room and the right side corridor room is a sky corridor. The apparatus is widely used in various corridor bridges.
Corridor bridge apparatus
TIAN HAIRONG (author)
2015-10-14
Patent
Electronic Resource
English
IPC:
E01D
BRIDGES
,
Brücken
Dublin, Ohio: Bridge Street Corridor
Springer Verlag | 2018
|Installation method for corridor bridge of large space steel structure
European Patent Office | 2015
|European Patent Office | 2017
|