Operation platform for overhauling cables on steel pipe pole
The invention discloses an operation platform for overhauling cables on a steel pipe pole, and relates to the field of cable installation and overhauling. The structure of the operation platform is that the overhaul operation platform (8) is rectangle-shaped; a fence (7) is fixed to the edge of a base plate (5) of the overhaul operation platform (8); the base plate (5) of the overhaul operation platform (8) is also provided with a rectangular opening (9); the base plate (5) of the overhaul operation platform (8) is fixed to a fixed frame (1) through bolts; U-shaped clamping grooves (4) are fixed to the bottom of the fixed frame (1); pins (2) are arranged on one side of the bottom of the fixed frame (1); the pins (2) are connected to buckles (3); and the buckles (3) are fixed to the base plate (5) of the overhaul operation platform (8) through bolts (6) after passing by the top ends of the U-shaped clamping grooves (4). The beneficial effects of the operation platform are that the construction cost is reduced; the surrounding occupied area is reduced; a construction period is shortened; falling prevention is reliably guaranteed; and the operation platform is convenient to install and dismount, is convenient to operate, and is flexible to use.
Operation platform for overhauling cables on steel pipe pole
The invention discloses an operation platform for overhauling cables on a steel pipe pole, and relates to the field of cable installation and overhauling. The structure of the operation platform is that the overhaul operation platform (8) is rectangle-shaped; a fence (7) is fixed to the edge of a base plate (5) of the overhaul operation platform (8); the base plate (5) of the overhaul operation platform (8) is also provided with a rectangular opening (9); the base plate (5) of the overhaul operation platform (8) is fixed to a fixed frame (1) through bolts; U-shaped clamping grooves (4) are fixed to the bottom of the fixed frame (1); pins (2) are arranged on one side of the bottom of the fixed frame (1); the pins (2) are connected to buckles (3); and the buckles (3) are fixed to the base plate (5) of the overhaul operation platform (8) through bolts (6) after passing by the top ends of the U-shaped clamping grooves (4). The beneficial effects of the operation platform are that the construction cost is reduced; the surrounding occupied area is reduced; a construction period is shortened; falling prevention is reliably guaranteed; and the operation platform is convenient to install and dismount, is convenient to operate, and is flexible to use.
Operation platform for overhauling cables on steel pipe pole
ZHU GUOQIANG (author) / SUN XUMING (author) / LIU WEIGUO (author) / DONG YAO (author) / WU XUEJUN (author) / XUE JIANFENG (author) / WANG ZHONGPENG (author) / LIN CHENGHAI (author) / QI LIANQING (author) / JU KELING (author)
2015-10-21
Patent
Electronic Resource
English
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Operation platform for overhauling cables on steel pipe pole
European Patent Office | 2015
|European Patent Office | 2020
|