Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
An open excavation construction method for expanding excavation of a station on a metro interzone shield tunnel foundation method includes the steps that uplift piles, wall columns, a base plate, a middle stand column foundation and transverse supporting beams between the wall columns are constructed in a transverse channel, wherein the base plate is connected with the bottoms of the wall columns, water prevention treatment is conducted, and the wall columns and duct pieces are connected, so that a sealed stress system is formed; soil over the tunnel is subjected to grouting reinforcement, an excavation retaining structure of a station body foundation bit is built, and the top end of the structure is connected with an external campshed or an underground diaphragm wall through a connection beam; slopes are supported through a composite soil nailing supporting technology, foot locking supports are erected at the pile foots, after excavation is conducted on the bottom of a foundation pit, residual duct pieces are removed, connection beams between the wall columns are constructed, and the connection beams are firmly connected with the duct pieces; the transverse support system is constructed. The method is reasonable, feasible and high in maneuverability. By means of application of the method, great economic benefits, social benefits and environmental benefits are achieved. The method has significant engineering application value and development prospects.
Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
An open excavation construction method for expanding excavation of a station on a metro interzone shield tunnel foundation method includes the steps that uplift piles, wall columns, a base plate, a middle stand column foundation and transverse supporting beams between the wall columns are constructed in a transverse channel, wherein the base plate is connected with the bottoms of the wall columns, water prevention treatment is conducted, and the wall columns and duct pieces are connected, so that a sealed stress system is formed; soil over the tunnel is subjected to grouting reinforcement, an excavation retaining structure of a station body foundation bit is built, and the top end of the structure is connected with an external campshed or an underground diaphragm wall through a connection beam; slopes are supported through a composite soil nailing supporting technology, foot locking supports are erected at the pile foots, after excavation is conducted on the bottom of a foundation pit, residual duct pieces are removed, connection beams between the wall columns are constructed, and the connection beams are firmly connected with the duct pieces; the transverse support system is constructed. The method is reasonable, feasible and high in maneuverability. By means of application of the method, great economic benefits, social benefits and environmental benefits are achieved. The method has significant engineering application value and development prospects.
Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
ZHANG MINGJU (author) / LIU YI (author)
2015-11-18
Patent
Electronic Resource
English
Expanding excavation structure for shield tunnel foundation and construction method thereof
European Patent Office | 2020
|Numerical Modeling of Affection of Foundation Pit Excavation on Metro Tunnel
British Library Conference Proceedings | 2012
|Numerical Modeling of Affection of Foundation Pit Excavation on Metro Tunnel
Trans Tech Publications | 2011
|Trans Tech Publications | 2013
|