Method and device for quickly forming ballast collecting platform at high and steep slope
The invention discloses a method and device for quickly forming a ballast collecting platform at a high and steep slope. The method is that an open ground being 4 to 6m in width is prepared below the side slope excavating surface before excavating a side slope; a group of concrete piers is arranged in parallel at the outer side of the open ground, and a steel column is embedded into each concrete pier; net rings are welded on the steel columns; a two-layer ballast stopping nets is pulled and tied to be fixed on the net rings and used as a parapet wall for quickly forming the ballast collecting platform on the open ground. With the adoption of the method in the formation of the ballast collecting platform, a small excavating surface is needed; the high and steep slope can be quickly excavated in an elevation-divided manner; the ballast can be conveniently moved out under the coordination of a dump truck and an excavator; the construction costs a short period; the investment is decreased. Meanwhile, the prefabricated steel columns are embedded into a concrete foundation, so that the formed ballast collecting device can effectively resist the impact force of rolling stones, and as a result, the ballast can be avoided falling into a riverbed directly, and the problem of difficult ballast collection at the high and steep slope can be solved.
Method and device for quickly forming ballast collecting platform at high and steep slope
The invention discloses a method and device for quickly forming a ballast collecting platform at a high and steep slope. The method is that an open ground being 4 to 6m in width is prepared below the side slope excavating surface before excavating a side slope; a group of concrete piers is arranged in parallel at the outer side of the open ground, and a steel column is embedded into each concrete pier; net rings are welded on the steel columns; a two-layer ballast stopping nets is pulled and tied to be fixed on the net rings and used as a parapet wall for quickly forming the ballast collecting platform on the open ground. With the adoption of the method in the formation of the ballast collecting platform, a small excavating surface is needed; the high and steep slope can be quickly excavated in an elevation-divided manner; the ballast can be conveniently moved out under the coordination of a dump truck and an excavator; the construction costs a short period; the investment is decreased. Meanwhile, the prefabricated steel columns are embedded into a concrete foundation, so that the formed ballast collecting device can effectively resist the impact force of rolling stones, and as a result, the ballast can be avoided falling into a riverbed directly, and the problem of difficult ballast collection at the high and steep slope can be solved.
Method and device for quickly forming ballast collecting platform at high and steep slope
JING LONG (author) / ZHANG QING (author)
2015-11-25
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Slag collecting platform safety protection device for high and steep slope excavation
European Patent Office | 2024
|Method for quickly regreening high and steep rock slope by using liana
European Patent Office | 2023
|European Patent Office | 2022
|European Patent Office | 2021
|