A platform for research: civil engineering, architecture and urbanism
Acid high-steep slope treatment method
The invention discloses an acid high-steep slope treatment method. The acid high-steep slope treatment method comprises the following steps that (1), the side slope of the damaged mountain is cleaned,pumice and dangerous stone are removed for mountain danger removal, and a geogrid is fixed to the side slope by using anchor rods after drilling in the side slope; (2), an acid liquid exudation pointis probed, flow guide grooves are formed in the slope surface, the acid liquid is guided to the bottom of the side slope in a flow guide and collecting manner, and acid liquid is drained through an acid discharging groove formed in the bottom of the side slope; (3), square steel keels are prepared, and the square steel keels are fixed to the slope surface with the flow guide grooves; (4) mesh pieces are hung on the square steel keels, and the mesh pieces are fixed to the anchor rods; and (5) a planting area is arranged at the bottom of the slope face, climbing plants are planted in the planting area, and the climbing plants can climb along the square steel keels.
本发明公开了了一种酸性高陡边坡治理方法,包括如下步骤:(1)清理破损山体的边坡,去除浮石、危石进行山体排险,并在边坡上钻孔后用锚杆将土工格栅固定在边坡上;(2)进行酸液渗出点的探查,坡面设置引流槽将酸液通过引流和会集的方式引流至边坡底部,并通过在边坡底部设置的排酸沟槽使酸液排走;(3)制备方钢龙骨,将所述方钢龙骨固定在已开设引流槽的坡面上;(4)在所述方钢龙骨上挂网片,并将所述网片固定在锚杆上;(5)在坡面底部设置种植区,其内种植攀援植物,所述攀援植物能够沿着方钢龙骨攀援。
Acid high-steep slope treatment method
The invention discloses an acid high-steep slope treatment method. The acid high-steep slope treatment method comprises the following steps that (1), the side slope of the damaged mountain is cleaned,pumice and dangerous stone are removed for mountain danger removal, and a geogrid is fixed to the side slope by using anchor rods after drilling in the side slope; (2), an acid liquid exudation pointis probed, flow guide grooves are formed in the slope surface, the acid liquid is guided to the bottom of the side slope in a flow guide and collecting manner, and acid liquid is drained through an acid discharging groove formed in the bottom of the side slope; (3), square steel keels are prepared, and the square steel keels are fixed to the slope surface with the flow guide grooves; (4) mesh pieces are hung on the square steel keels, and the mesh pieces are fixed to the anchor rods; and (5) a planting area is arranged at the bottom of the slope face, climbing plants are planted in the planting area, and the climbing plants can climb along the square steel keels.
本发明公开了了一种酸性高陡边坡治理方法,包括如下步骤:(1)清理破损山体的边坡,去除浮石、危石进行山体排险,并在边坡上钻孔后用锚杆将土工格栅固定在边坡上;(2)进行酸液渗出点的探查,坡面设置引流槽将酸液通过引流和会集的方式引流至边坡底部,并通过在边坡底部设置的排酸沟槽使酸液排走;(3)制备方钢龙骨,将所述方钢龙骨固定在已开设引流槽的坡面上;(4)在所述方钢龙骨上挂网片,并将所述网片固定在锚杆上;(5)在坡面底部设置种植区,其内种植攀援植物,所述攀援植物能够沿着方钢龙骨攀援。
Acid high-steep slope treatment method
一种酸性高陡边坡治理方法
WANG JUNFANG (author) / WU JIANYU (author) / YAN ZHIYONG (author) / PAN LIANG (author)
2020-04-17
Patent
Electronic Resource
Chinese
Slope surface treatment assembly for high and steep slope of mine pit
European Patent Office | 2023
|