A platform for research: civil engineering, architecture and urbanism
Construction method for protective side slope
The invention discloses a construction method for a protective side slope. The method comprises the steps that 1, the position of an upper soil layer to be excavated is determined on an upper operation face of a base body, and an upper reinforcing body extending into the base body is arranged at the end of the upper soil layer to be excavated; 2, the upper soil layer to be excavated is excavated for forming a lower operation face, and the bottom end of the upper reinforcing body is lower than the lower operation face; 3, a lower reinforcing body extending into the base body is arranged on the lower operation face in the manner of making contact with the upper reinforcing body, and a lower soil layer to be excavated is formed on the soil body corresponding to the lower operation face; and 4, the second and third steps are executed repeatedly till soil excavation is completed, the multiple reinforcing bodies which are in contact form a side slope protective body, and the exposed faces of the multiple reinforcing bodies form the protective face of the side slope protective body.
Construction method for protective side slope
The invention discloses a construction method for a protective side slope. The method comprises the steps that 1, the position of an upper soil layer to be excavated is determined on an upper operation face of a base body, and an upper reinforcing body extending into the base body is arranged at the end of the upper soil layer to be excavated; 2, the upper soil layer to be excavated is excavated for forming a lower operation face, and the bottom end of the upper reinforcing body is lower than the lower operation face; 3, a lower reinforcing body extending into the base body is arranged on the lower operation face in the manner of making contact with the upper reinforcing body, and a lower soil layer to be excavated is formed on the soil body corresponding to the lower operation face; and 4, the second and third steps are executed repeatedly till soil excavation is completed, the multiple reinforcing bodies which are in contact form a side slope protective body, and the exposed faces of the multiple reinforcing bodies form the protective face of the side slope protective body.
Construction method for protective side slope
SHI CUNLIN (author) / YE YANGSHENG (author) / CAI DEGOU (author) / ZHANG QIANLI (author) / CHEN FENG (author) / YAO JIANPING (author) / YAN HONGYE (author) / LI ZHONGGUO (author) / ZHU HONGWEI (author) / WANG LIJUN (author)
2016-02-03
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Large-lattice protective unit used for water side slope and side slope protective structure
European Patent Office | 2020
|European Patent Office | 2024
|Dynamic compaction side slope and dynamic compaction side slope construction method
European Patent Office | 2022
|Side slope anchor cable and side slope anchoring construction method thereof
European Patent Office | 2022
|