A platform for research: civil engineering, architecture and urbanism
Wall body reversed construction method and wall body and concrete framework casting structure
The invention discloses a wall body reversed construction method and a wall body and concrete framework casting structure. According to the wall body reversed construction method, the construction of the upper layer of wall body is immediately performed after the casting of the lower layer of concrete framework is completed and certain strength is reached; during the building of the upper layer of wall body, steel bars connected with the concrete framework are embedded at the two sides and the top of the wall body; after the wall body is built, a casting formwork of the concrete framework can be erected by using the wall body as a fixing object; the framework is connected with the wall body through opposite-pulling screw rods; the wall body can be used as a framework at one side of the concrete framework; then, the casting of the concrete framework is performed, so that the wall body and the concrete framework are connected into a whole structure; and the connection stability of the wall body and the concrete framework is improved. The method has the advantages that the connection strength of the wall body is high; the stability of the wall body is high; the wall body can be used as a supporter for fixing the framework and can be used as frameworks at two sides; the installation of the frameworks can be convenient; and the consumption of the frameworks can be reduced. Meanwhile, the construction efficiency can also be improved, and the construction schedule can be accelerated.
Wall body reversed construction method and wall body and concrete framework casting structure
The invention discloses a wall body reversed construction method and a wall body and concrete framework casting structure. According to the wall body reversed construction method, the construction of the upper layer of wall body is immediately performed after the casting of the lower layer of concrete framework is completed and certain strength is reached; during the building of the upper layer of wall body, steel bars connected with the concrete framework are embedded at the two sides and the top of the wall body; after the wall body is built, a casting formwork of the concrete framework can be erected by using the wall body as a fixing object; the framework is connected with the wall body through opposite-pulling screw rods; the wall body can be used as a framework at one side of the concrete framework; then, the casting of the concrete framework is performed, so that the wall body and the concrete framework are connected into a whole structure; and the connection stability of the wall body and the concrete framework is improved. The method has the advantages that the connection strength of the wall body is high; the stability of the wall body is high; the wall body can be used as a supporter for fixing the framework and can be used as frameworks at two sides; the installation of the frameworks can be convenient; and the consumption of the frameworks can be reduced. Meanwhile, the construction efficiency can also be improved, and the construction schedule can be accelerated.
Wall body reversed construction method and wall body and concrete framework casting structure
WANG JIAXIN (author) / WANG DIAN (author) / ZHENG CHUANBIN (author)
2016-02-10
Patent
Electronic Resource
English
European Patent Office | 2023
|Wall body concrete pouring wall formwork construction method
European Patent Office | 2020
|WALL BODY, WALL STRUCTURE AND CONSTRUCTION METHOD OF THE WALL BODY AND THE WALL STRUCTURE
European Patent Office | 2016
|