Provided is a structure construction method for a tower crane foundation serving as a basement bottom plate. The method is characterized by comprising the following technical measures that a, a foundation bottom plate is poured; b, steel bars are reserved; c, a tower crane anchor bolt is treated; d, tower crane waterproofness treatment is carried out; e, grading gravel construction is carried out; f, steel bars are reserved in the top plate tower crane positions of the third floor underground and the second floor underground; g, construction joints are treated; and h, post-poured concrete is poured. The structure construction method for the tower crane foundation serving as the basement bottom plate has the beneficial effects that the construction scheme is worked out in advance, the construction process is simple and convenient, repeated construction is avoided, and project cost is reduced.
Provided is a structure construction method for a tower crane foundation serving as a basement bottom plate. The method is characterized by comprising the following technical measures that a, a foundation bottom plate is poured; b, steel bars are reserved; c, a tower crane anchor bolt is treated; d, tower crane waterproofness treatment is carried out; e, grading gravel construction is carried out; f, steel bars are reserved in the top plate tower crane positions of the third floor underground and the second floor underground; g, construction joints are treated; and h, post-poured concrete is poured. The structure construction method for the tower crane foundation serving as the basement bottom plate has the beneficial effects that the construction scheme is worked out in advance, the construction process is simple and convenient, repeated construction is avoided, and project cost is reduced.
Tower crane foundation construction method based on basement bottom plate
European Patent Office | 2024
|European Patent Office | 2024
|