A platform for research: civil engineering, architecture and urbanism
Construction method of emery ramp
The invention provides a construction method of an emery ramp. The method includes base layer treatment, wear resistant ground construction, anti-skid groove positioning, anti-skid groove milling and cleaning and other steps. Specifically, the anti-skid groove milling employs a diamond grinding head with a width of 20mm-30mm to mill an anti-skid groove with a depth of 15mm-20mm along the anti-skid groove line. By means of the diamond grinding head with specific width, the anti-skid groove can be milled at a time, thus ensuring consistent width and depth of the anti-skid groove, smooth groove bottom, difficult damage of the notch line, good antiskid effect and perception effect of the anti-skid groove, and high construction efficiency. At the same time, making of the anti-skid groove by milling can effectively prevent the influence of cutting and chiseling produced vibration on concrete cushion, and ensures the quality of wear resistant ground.
Construction method of emery ramp
The invention provides a construction method of an emery ramp. The method includes base layer treatment, wear resistant ground construction, anti-skid groove positioning, anti-skid groove milling and cleaning and other steps. Specifically, the anti-skid groove milling employs a diamond grinding head with a width of 20mm-30mm to mill an anti-skid groove with a depth of 15mm-20mm along the anti-skid groove line. By means of the diamond grinding head with specific width, the anti-skid groove can be milled at a time, thus ensuring consistent width and depth of the anti-skid groove, smooth groove bottom, difficult damage of the notch line, good antiskid effect and perception effect of the anti-skid groove, and high construction efficiency. At the same time, making of the anti-skid groove by milling can effectively prevent the influence of cutting and chiseling produced vibration on concrete cushion, and ensures the quality of wear resistant ground.
Construction method of emery ramp
ZHUANG JIANPING (author) / CHEN ZHIBIN (author) / LIN HUIZHONG (author) / WANG ZHAORAN (author) / HUANG ZHUAN (author) / FU BINGYAN (author) / FANG MINGSHENG (author) / XIAO CHENGHUI (author) / LIAO JIANGDONG (author) / CHEN LINGXIANG (author)
2016-02-24
Patent
Electronic Resource
English
High-precision hollowing-free emery ground construction process
European Patent Office | 2021
|Construction method suitable for emery structural ground of large factory building
European Patent Office | 2016
|European Patent Office | 2022
|Hollow and micropore repair construction method of wear-resisting emery ground
European Patent Office | 2020
|