Fabricated building template supporting method
The invention discloses a fabricated building template supporting method. The method comprises the following steps: (1) manufacturing a supporting structure which comprises a main cross beam, a hoop and a stop block set, wherein the radial size of an inner ring of the hoop is larger than that of a pier stud, the hoop is formed by splicing two semi-ring pieces, and the check block set comprises a plurality of wedge-shaped check blocks; (2) connecting the two semi-ring pieces through a first connecting assembly to splice the two semi-ring pieces into the hoop arranged on the pier stud in a sleeving manner; (3) arranging the check block set on the side wall of the pier stud below the hoop; (4) vertically downwards pressing the hoop to make the wedge tips of the wedge-shaped stop blocks inserted into the inner ring of the hoop; (5) arranging the main cross beam on the upper surface of the hoop, and erecting a building template on the main cross beam; and (6) dismounting the main cross beamand the building formwork after the building formwork is used, upwards vertically pushing the loop to separate the hoop from the stop block set, and relieving connection of the first connecting assembly to complete dismounting of the supporting structure. The method uses the pier stud to fix the supporting structure to achieve building formwork supporting.
本发明公开了装配式建筑模板支撑方法,该方法包括以下步骤:(1)制作支撑结构,包括主横梁,抱箍和挡块组;抱箍的内环径向尺寸大于墩柱径向尺寸,抱箍由两个半环件拼接构成,挡块组包括多个楔形挡块;(2)通过第一连接组件连接两个半环件将其拼接成套设于所述墩柱上的抱箍;(3)将所述挡块组置于抱箍下方的墩柱侧壁上;(4)竖直下压抱箍,使楔形挡块的楔尖插入所述抱箍内环中;(5)将主横梁安置于所述抱箍上表面,建筑模板搭设在所述主横梁上;(6)建筑模板使用完拆除主横梁和建筑模板,竖直向上推顶抱箍使抱箍与挡块组分离,解除第一连接组件的连接即完成支撑结构的拆卸。该方法能够利用墩柱进行支撑结构固定实现建筑模板支撑。
Fabricated building template supporting method
The invention discloses a fabricated building template supporting method. The method comprises the following steps: (1) manufacturing a supporting structure which comprises a main cross beam, a hoop and a stop block set, wherein the radial size of an inner ring of the hoop is larger than that of a pier stud, the hoop is formed by splicing two semi-ring pieces, and the check block set comprises a plurality of wedge-shaped check blocks; (2) connecting the two semi-ring pieces through a first connecting assembly to splice the two semi-ring pieces into the hoop arranged on the pier stud in a sleeving manner; (3) arranging the check block set on the side wall of the pier stud below the hoop; (4) vertically downwards pressing the hoop to make the wedge tips of the wedge-shaped stop blocks inserted into the inner ring of the hoop; (5) arranging the main cross beam on the upper surface of the hoop, and erecting a building template on the main cross beam; and (6) dismounting the main cross beamand the building formwork after the building formwork is used, upwards vertically pushing the loop to separate the hoop from the stop block set, and relieving connection of the first connecting assembly to complete dismounting of the supporting structure. The method uses the pier stud to fix the supporting structure to achieve building formwork supporting.
本发明公开了装配式建筑模板支撑方法,该方法包括以下步骤:(1)制作支撑结构,包括主横梁,抱箍和挡块组;抱箍的内环径向尺寸大于墩柱径向尺寸,抱箍由两个半环件拼接构成,挡块组包括多个楔形挡块;(2)通过第一连接组件连接两个半环件将其拼接成套设于所述墩柱上的抱箍;(3)将所述挡块组置于抱箍下方的墩柱侧壁上;(4)竖直下压抱箍,使楔形挡块的楔尖插入所述抱箍内环中;(5)将主横梁安置于所述抱箍上表面,建筑模板搭设在所述主横梁上;(6)建筑模板使用完拆除主横梁和建筑模板,竖直向上推顶抱箍使抱箍与挡块组分离,解除第一连接组件的连接即完成支撑结构的拆卸。该方法能够利用墩柱进行支撑结构固定实现建筑模板支撑。
Fabricated building template supporting method
装配式建筑模板支撑方法
FENG HAIBAO (author) / FENG JIAXIN (author) / WANG XIANG (author) / JU PENG (author) / QU LILI (author) / XU SHANZHONG (author) / FU DAWEI (author) / WANG MINGYU (author) / WANG CHUANPENG (author) / LYU SHILEI (author)
2020-04-10
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Adjustable building template supporting structure and building template supporting rod
European Patent Office | 2024
|Fabricated building supporting structure and supporting method
European Patent Office | 2023
|