The invention relates to a terrazzo flooring construction device. The terrazzo flooring construction device comprises a placement frame, an adjustment bottom plate, a control mechanism, a feeding mechanism and self-lockable universal wheels, wherein the self-lockable universal wheels are symmetrically installed on the left and right sides of the placement frame, a leveling mechanism is installed on the upper side of the inner wall of the placement frame, the adjustment bottom plate is installed at the lower end of the inner wall, and the feeding mechanism is installed on the lower side of theplacement frame. The terrazzo flooring construction device can solve the following problems in an existing terrazzo flooring construction process that it is needed to place materials at a position ofa specified specification manually, the uniformity of material placement cannot be guaranteed by manual work, the overall effect of terrazzo flooring after construction is affected, and the attractiveness of the terrazzo flooring is reduced; and for construction work with high specification requirements, constructors need to bend down to place terrazzo materials one by one, the labor intensity ishigh, the constructors' waist is likely to be damaged, and it is harmful to the constructors' health to bend down to work for a long time.
本发明涉及一种水磨石地面施工设备,包括放置框,调节底板,控制机构,给料机构与可自锁的万向轮,所述的放置框左右两侧对称安装有可自锁的万向轮,放置框的内壁上侧安装有抚平机构内壁的下端安装有调节底板,放置框的下侧安装有给料机构。本发明可以解决现有水磨石地面在施工过程中存在的以下难题,需要人工将材料到指定规格的的位置,人工无法保证材料放置的均匀程度,影响水磨石地面完工后的整体效果,降低水磨石地面的美观度,针对要求规格较高的施工作业需要人工弯腰逐一放置水磨石材料,劳动强度大,容易造成施工人员的腰部受损,长期弯腰作业对施工人员的身体健康具有危害。
The invention relates to a terrazzo flooring construction device. The terrazzo flooring construction device comprises a placement frame, an adjustment bottom plate, a control mechanism, a feeding mechanism and self-lockable universal wheels, wherein the self-lockable universal wheels are symmetrically installed on the left and right sides of the placement frame, a leveling mechanism is installed on the upper side of the inner wall of the placement frame, the adjustment bottom plate is installed at the lower end of the inner wall, and the feeding mechanism is installed on the lower side of theplacement frame. The terrazzo flooring construction device can solve the following problems in an existing terrazzo flooring construction process that it is needed to place materials at a position ofa specified specification manually, the uniformity of material placement cannot be guaranteed by manual work, the overall effect of terrazzo flooring after construction is affected, and the attractiveness of the terrazzo flooring is reduced; and for construction work with high specification requirements, constructors need to bend down to place terrazzo materials one by one, the labor intensity ishigh, the constructors' waist is likely to be damaged, and it is harmful to the constructors' health to bend down to work for a long time.
本发明涉及一种水磨石地面施工设备,包括放置框,调节底板,控制机构,给料机构与可自锁的万向轮,所述的放置框左右两侧对称安装有可自锁的万向轮,放置框的内壁上侧安装有抚平机构内壁的下端安装有调节底板,放置框的下侧安装有给料机构。本发明可以解决现有水磨石地面在施工过程中存在的以下难题,需要人工将材料到指定规格的的位置,人工无法保证材料放置的均匀程度,影响水磨石地面完工后的整体效果,降低水磨石地面的美观度,针对要求规格较高的施工作业需要人工弯腰逐一放置水磨石材料,劳动强度大,容易造成施工人员的腰部受损,长期弯腰作业对施工人员的身体健康具有危害。
Terrazzo flooring construction device
一种水磨石地面施工设备
LI MINGHUI (author)
2020-04-10
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Flooring. Terrazzo is outgrowing its utilitarian image
British Library Online Contents | 1996
Abrasion resistance of concrete terrazzo flooring tiles
Engineering Index Backfile | 1965
|Flooring. Terrazzo is outgrowing its utilitarian image
Online Contents | 1996
Works of Art Underfoot-Thin-Set Epoxy Terrazzo Flooring
British Library Online Contents | 2004
|