The invention belongs to the field of rail installation, and particularly relates to a precision equipment track mounting method. Aiming at the problems of low installation efficiency and poor stability of the existing track, the invention provides the following solution: step 1, setting a simulated installation drawing by a computer according to the requirement and installation position of a track to be installed, and calculating required materials, equipment, manpower and engineering time according to the simulated drawing; 2, setting a base point according to the central point of the installation of a simulation track. According to the precision equipment track mounting method, before installation using the equipment track installation method provided by the invention, a track simulatedinstallation drawing is set before installation; a pressing plate and a base plate are laid from the central part to the two sides of the central part; meanwhile, the multiple rail bearing beams arewelded together according to the workable range, the rear bearing end is installed at the top of a pressing plate, a preset rail bearing beam connecting point is taken as a base point during installation, the accuracy of the installation position is ensured, meanwhile, construction can be conducted in multiple directions, the overall installation rate can be increased, efficiency is high, and theinstallation position is accurate.
本发明属于轨道安装领域,尤其是一种精密设备轨道安装方法,针对现有的现有的轨道安装效率低且稳固性差的问题,现提出如下解决方案,包括以下安装步骤:步骤一:根据所需安装轨道需求和安装位置由电脑设定模拟安装图,并根据模拟图计算所需材料、设备、人工和工程时间;步骤二:按照模拟轨道安装的中心点设定基点。本发明提出的设备轨道安装方法安装前设定轨道的模拟安装图,并选取中心部位由中心部位向两侧铺设压板和垫板,同时将多个承轨梁按照可工作范围焊接在一起后承端安装在压板顶部,安装时以预设的承轨梁连接点作为基点,确保安装位置的准确,同时可以多方向进行施工,能够提高整体的安装速率,效率高且安装位置准确。
The invention belongs to the field of rail installation, and particularly relates to a precision equipment track mounting method. Aiming at the problems of low installation efficiency and poor stability of the existing track, the invention provides the following solution: step 1, setting a simulated installation drawing by a computer according to the requirement and installation position of a track to be installed, and calculating required materials, equipment, manpower and engineering time according to the simulated drawing; 2, setting a base point according to the central point of the installation of a simulation track. According to the precision equipment track mounting method, before installation using the equipment track installation method provided by the invention, a track simulatedinstallation drawing is set before installation; a pressing plate and a base plate are laid from the central part to the two sides of the central part; meanwhile, the multiple rail bearing beams arewelded together according to the workable range, the rear bearing end is installed at the top of a pressing plate, a preset rail bearing beam connecting point is taken as a base point during installation, the accuracy of the installation position is ensured, meanwhile, construction can be conducted in multiple directions, the overall installation rate can be increased, efficiency is high, and theinstallation position is accurate.
本发明属于轨道安装领域,尤其是一种精密设备轨道安装方法,针对现有的现有的轨道安装效率低且稳固性差的问题,现提出如下解决方案,包括以下安装步骤:步骤一:根据所需安装轨道需求和安装位置由电脑设定模拟安装图,并根据模拟图计算所需材料、设备、人工和工程时间;步骤二:按照模拟轨道安装的中心点设定基点。本发明提出的设备轨道安装方法安装前设定轨道的模拟安装图,并选取中心部位由中心部位向两侧铺设压板和垫板,同时将多个承轨梁按照可工作范围焊接在一起后承端安装在压板顶部,安装时以预设的承轨梁连接点作为基点,确保安装位置的准确,同时可以多方向进行施工,能够提高整体的安装速率,效率高且安装位置准确。
High-precision mounting method for industrial factory building equipment track
European Patent Office | 2022
|Steel track beam mounting mould and steel track beam mounting method