A platform for research: civil engineering, architecture and urbanism
High-precision mounting method for industrial factory building equipment track
The invention relates to the field of building construction, and particularly discloses a high-precision mounting method for an industrial plant equipment track, which comprises the following steps: step 1, a worker excavates a foundation pit at the top position of a specified foundation, and paves a steel bar net rack in the foundation pit; secondly, a worker conducts trepanning machining on the four corners of the anchor bolt plate, foot margin screws are installed on the anchor bolt plate, the worker installs the foot margin screws and fixing rods at the bottom ends of the foot margin screws on the top of the steel bar net rack through iron wires, and the position of the anchor bolt plate is fixed through nuts on the foot margin screws; and thirdly, adjusting mechanisms are installed on the portions, located on the anchor bolt plates at the two ends of the interior of the foundation pit, of the foundation screws, the inclination conditions of the foundation screws are detected through the adjusting mechanisms, and the positions of the foundation screws are manually adjusted. During use, the mounting position of the steel beam can be accurately adjusted, and the position of the steel beam can be well fixed during mounting.
本发明涉及建设施工领域,具体的公开了一种工业化厂房设备轨道高精度安装方法,包括如下步骤:步骤一:工作人员在指定地基的顶部位置进行基坑挖掘,并在基坑的内部铺设钢筋网架;步骤二:工作人员对锚栓板的四个边角处进行开孔加工,并在其上安装地脚螺杆,工作人员通过铁丝把地脚螺杆和其底端的固定杆安装在钢筋网架的顶部,并通过地脚螺杆上的螺帽对锚栓板的位置进行固定;步骤三:在位于基坑内部两端锚栓板上的地脚螺杆安装调节机构,通过调整机构对地脚螺杆的倾斜情况进行检测,并手动对地脚螺杆的位置进行调节。本发明在使用时能对钢梁的安装位置进行精准调整,且在安装时能对钢梁起到较好的位置固定。
High-precision mounting method for industrial factory building equipment track
The invention relates to the field of building construction, and particularly discloses a high-precision mounting method for an industrial plant equipment track, which comprises the following steps: step 1, a worker excavates a foundation pit at the top position of a specified foundation, and paves a steel bar net rack in the foundation pit; secondly, a worker conducts trepanning machining on the four corners of the anchor bolt plate, foot margin screws are installed on the anchor bolt plate, the worker installs the foot margin screws and fixing rods at the bottom ends of the foot margin screws on the top of the steel bar net rack through iron wires, and the position of the anchor bolt plate is fixed through nuts on the foot margin screws; and thirdly, adjusting mechanisms are installed on the portions, located on the anchor bolt plates at the two ends of the interior of the foundation pit, of the foundation screws, the inclination conditions of the foundation screws are detected through the adjusting mechanisms, and the positions of the foundation screws are manually adjusted. During use, the mounting position of the steel beam can be accurately adjusted, and the position of the steel beam can be well fixed during mounting.
本发明涉及建设施工领域,具体的公开了一种工业化厂房设备轨道高精度安装方法,包括如下步骤:步骤一:工作人员在指定地基的顶部位置进行基坑挖掘,并在基坑的内部铺设钢筋网架;步骤二:工作人员对锚栓板的四个边角处进行开孔加工,并在其上安装地脚螺杆,工作人员通过铁丝把地脚螺杆和其底端的固定杆安装在钢筋网架的顶部,并通过地脚螺杆上的螺帽对锚栓板的位置进行固定;步骤三:在位于基坑内部两端锚栓板上的地脚螺杆安装调节机构,通过调整机构对地脚螺杆的倾斜情况进行检测,并手动对地脚螺杆的位置进行调节。本发明在使用时能对钢梁的安装位置进行精准调整,且在安装时能对钢梁起到较好的位置固定。
High-precision mounting method for industrial factory building equipment track
一种工业化厂房设备轨道高精度安装方法
QU CHUANG (author) / ZHANG CHAO (author) / PENG GANG (author) / LI DONGMING (author) / XU HAIBO (author)
2022-06-24
Patent
Electronic Resource
Chinese
Industrial factory building curtain wall mounting tool and using method
European Patent Office | 2022
|Supporting platform for mounting of steel structure industrial factory building
European Patent Office | 2021
|Cross beam guide mounting equipment for steel structure sandstone factory building
European Patent Office | 2021
|