A platform for research: civil engineering, architecture and urbanism
Wedge-shaped deviation rectifying pile and construction method thereof
The invention discloses a wedge-shaped deviation rectifying pile and a construction method thereof, belongs to the technical field of steel sheet piles. In the construction of a steel sheet pile, whenthe steel sheet pile is inclined along the length direction of a wall and cannot be constructed due to a plurality of factors such as differences of operation skills of construction teams, differentpile driving equipment and geological conditions, the steel sheet pile needs to be pulled out in time for pile driving again, and labor and time are wasted. The deviation rectifying pile is driven infor rectifying deviation when deviation is found, labor and time are saved, safety is realized, the wedge angle of the deviation rectifying pile is manufactured according to field measurement values,pertinency is high, manufacturing is easy, and the cost is low.
本发明公开了一种楔形纠偏桩及其施工方法,属于钢板桩技术领域,在钢板桩的施工中,由于施工队伍的操作技能的差异,打桩设备的不同及地质条件等诸多因素而导致的钢板桩墙沿墙长度方向倾斜而无法施工时,需将钢板桩及时拔出,重新打桩,费工费时,而用纠偏桩发现倾斜时打入纠正,省工省时亦安全,纠偏桩楔形角度按现场测量数值制作,针对性强,制作简单,成本低。
Wedge-shaped deviation rectifying pile and construction method thereof
The invention discloses a wedge-shaped deviation rectifying pile and a construction method thereof, belongs to the technical field of steel sheet piles. In the construction of a steel sheet pile, whenthe steel sheet pile is inclined along the length direction of a wall and cannot be constructed due to a plurality of factors such as differences of operation skills of construction teams, differentpile driving equipment and geological conditions, the steel sheet pile needs to be pulled out in time for pile driving again, and labor and time are wasted. The deviation rectifying pile is driven infor rectifying deviation when deviation is found, labor and time are saved, safety is realized, the wedge angle of the deviation rectifying pile is manufactured according to field measurement values,pertinency is high, manufacturing is easy, and the cost is low.
本发明公开了一种楔形纠偏桩及其施工方法,属于钢板桩技术领域,在钢板桩的施工中,由于施工队伍的操作技能的差异,打桩设备的不同及地质条件等诸多因素而导致的钢板桩墙沿墙长度方向倾斜而无法施工时,需将钢板桩及时拔出,重新打桩,费工费时,而用纠偏桩发现倾斜时打入纠正,省工省时亦安全,纠偏桩楔形角度按现场测量数值制作,针对性强,制作简单,成本低。
Wedge-shaped deviation rectifying pile and construction method thereof
一种楔形纠偏桩及其施工方法
SUN FAMING (author) / ZHANG SHUNSHENG (author)
2020-04-21
Patent
Electronic Resource
Chinese
Single-pile deviation rectifying device and construction method thereof
European Patent Office | 2022
|European Patent Office | 2021
|Lime pile foundation deviation rectifying structure and construction method thereof
European Patent Office | 2023
|Iron tower pile foundation deviation rectifying structure and deviation rectifying process thereof
European Patent Office | 2024
|European Patent Office | 2023
|