A platform for research: civil engineering, architecture and urbanism
Prefabricated composite floor slab fixing mounting construction method
The invention relates to a prefabricated composite floor slab fixing mounting construction method. Equipment adopted by the method comprises a moving device, a hydraulic cylinder, a positioning deviceand a fixing device, wherein the hydraulic cylinder is fixedly installed at the upper end of the moving device, the positioning device is fixedly installed at the upper end of the hydraulic cylinder,the fixing device is fixedly installed at the front end of the positioning device, the positioning device comprises a fixing plate, an electric push rod, a supporting plate, balls, a rubber plate anda positioning block, and the fixing device comprises a telescopic support, a rectangular long plate, a small motor, a rotating frame, a first gear, a second gear and a lifting rope frame. According to the method, through cooperation between the positioning device and the fixing device, a composite floor slab is stressed evenly in the whole moving and fixing mounting process, the surface is not damaged, and through cooperation among the moving device, the positioning device and the fixing device, the equipment can freely move in a small working space, so that the purpose of positioning the composite floor slab is achieved.
本发明涉及一种预制叠合楼板固定安装施工方法,包括运动装置、液压缸、定位装置与固定装置,运动装置上端固定安装有液压缸,液压缸上端固定安装有定位装置,定位装置前端固定安装有固定装置,所述定位装置包括固定板、电动推杆、支撑板、滚珠、橡胶板与定位块,所述固定装置包括可伸缩支架、矩形长板、小电机、转动架、齿轮一、齿轮二与吊绳架,本发明通过定位装置与固定装置配合,使叠合楼板在整个运动以及固定安装过程中受力均匀,且表面不受损伤,且通过运动装置、定位装置与固定装置的配合,使设备可在较小的工作空间内进行自由移动,以达到对叠合楼板进行定位的目的。
Prefabricated composite floor slab fixing mounting construction method
The invention relates to a prefabricated composite floor slab fixing mounting construction method. Equipment adopted by the method comprises a moving device, a hydraulic cylinder, a positioning deviceand a fixing device, wherein the hydraulic cylinder is fixedly installed at the upper end of the moving device, the positioning device is fixedly installed at the upper end of the hydraulic cylinder,the fixing device is fixedly installed at the front end of the positioning device, the positioning device comprises a fixing plate, an electric push rod, a supporting plate, balls, a rubber plate anda positioning block, and the fixing device comprises a telescopic support, a rectangular long plate, a small motor, a rotating frame, a first gear, a second gear and a lifting rope frame. According to the method, through cooperation between the positioning device and the fixing device, a composite floor slab is stressed evenly in the whole moving and fixing mounting process, the surface is not damaged, and through cooperation among the moving device, the positioning device and the fixing device, the equipment can freely move in a small working space, so that the purpose of positioning the composite floor slab is achieved.
本发明涉及一种预制叠合楼板固定安装施工方法,包括运动装置、液压缸、定位装置与固定装置,运动装置上端固定安装有液压缸,液压缸上端固定安装有定位装置,定位装置前端固定安装有固定装置,所述定位装置包括固定板、电动推杆、支撑板、滚珠、橡胶板与定位块,所述固定装置包括可伸缩支架、矩形长板、小电机、转动架、齿轮一、齿轮二与吊绳架,本发明通过定位装置与固定装置配合,使叠合楼板在整个运动以及固定安装过程中受力均匀,且表面不受损伤,且通过运动装置、定位装置与固定装置的配合,使设备可在较小的工作空间内进行自由移动,以达到对叠合楼板进行定位的目的。
Prefabricated composite floor slab fixing mounting construction method
一种预制叠合楼板固定安装施工方法
LIU XIUJUAN (author)
2020-04-21
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Prefabricated floor slab mounting node and construction method thereof
European Patent Office | 2021
|Construction method of prefabricated composite floor slab
European Patent Office | 2022
|