A platform for research: civil engineering, architecture and urbanism
Building construction material conveying device
The invention discloses a building construction material conveying device. A conveying vehicle is included and connected with a base through a hook. A lifting bin is arranged above the base. A vehiclebox is arranged above the lifting bin. A hydraulic pump is arranged in the lifting bin. A sliding module is arranged on one side of the hydraulic pump, and the sliding module and a third steel battenare connected through a hinge. The third steel batten is connected with a second steel batten through a hinge. A fixed module is arranged on one side of the sliding module. The fixed module and a first steel batten are connected through a hinge. The first steel batten and a fourth steel batten are connected through a hinge. A hydraulic rod is arranged on one side of the fixed module. A first connecting rod is arranged at the top end of the hydraulic rod. The building construction material conveying device is simple in operation, the vehicle box can be lifted, high-layer conveying of buildingconstruction materials is facilitated, and meanwhile fragile building construction materials are conveniently conveyed.
本发明公开了一种建筑施工材料输送装置,包括输送车,所述输送车与底座通过挂钩连接,所述底座的上方安装有升降仓,所述升降仓的上方安装有车箱,所述升降仓的内部安装有液压泵,所述液压泵的一侧安装有滑动模块,所述滑动模块与丙钢板条通过铰链连接,所述丙钢板条与乙钢板条通过铰链连接,所述滑动模块的一侧安装有固定模块,所述固定模块与甲钢板条通过铰链连接,所述甲钢板条与丁钢板条通过铰链连接,所述固定模块的一侧安装有液压杆,所述液压杆的顶端安装有第一连接杆。本发明操作简单,可以对车箱进行升降,方便建筑施工材料高层输送,同时方便输送易碎的建筑施工材料。
Building construction material conveying device
The invention discloses a building construction material conveying device. A conveying vehicle is included and connected with a base through a hook. A lifting bin is arranged above the base. A vehiclebox is arranged above the lifting bin. A hydraulic pump is arranged in the lifting bin. A sliding module is arranged on one side of the hydraulic pump, and the sliding module and a third steel battenare connected through a hinge. The third steel batten is connected with a second steel batten through a hinge. A fixed module is arranged on one side of the sliding module. The fixed module and a first steel batten are connected through a hinge. The first steel batten and a fourth steel batten are connected through a hinge. A hydraulic rod is arranged on one side of the fixed module. A first connecting rod is arranged at the top end of the hydraulic rod. The building construction material conveying device is simple in operation, the vehicle box can be lifted, high-layer conveying of buildingconstruction materials is facilitated, and meanwhile fragile building construction materials are conveniently conveyed.
本发明公开了一种建筑施工材料输送装置,包括输送车,所述输送车与底座通过挂钩连接,所述底座的上方安装有升降仓,所述升降仓的上方安装有车箱,所述升降仓的内部安装有液压泵,所述液压泵的一侧安装有滑动模块,所述滑动模块与丙钢板条通过铰链连接,所述丙钢板条与乙钢板条通过铰链连接,所述滑动模块的一侧安装有固定模块,所述固定模块与甲钢板条通过铰链连接,所述甲钢板条与丁钢板条通过铰链连接,所述固定模块的一侧安装有液压杆,所述液压杆的顶端安装有第一连接杆。本发明操作简单,可以对车箱进行升降,方便建筑施工材料高层输送,同时方便输送易碎的建筑施工材料。
Building construction material conveying device
一种建筑施工材料输送装置
HAN QIONGYAO (author)
2020-04-24
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building material conveying device for construction engineering
European Patent Office | 2021
|Building construction material conveying structure and construction method
European Patent Office | 2021
|