A platform for research: civil engineering, architecture and urbanism
Building construction material conveying structure and construction method
The invention relates to the field of building engineering construction equipment, in particular to a building construction material conveying structure and a construction method, the building construction material conveying structure can climb upwards continuously along with building construction, so that low-cost, high-efficiency and safe conveying of materials on the top layer of a construction building is achieved continuously. The structure involves a construction building, a vertical conveying system is arranged on the side wall of the construction building, a horizontal conveying system is arranged above a top platform of the construction building, a side wall climbing mechanism is arranged on the side wall of the construction building, an internal climbing mechanism is arranged inside the construction building, and the horizontal conveying system is arranged on the side wall climbing mechanism and the internal climbing mechanism. The building construction material conveying structure and the construction method are particularly suitable for building construction of high floors.
本发明涉及建筑工程施工装备领域,尤其是一种可以随楼层修建而不断往上攀爬,从而不断实现对施工建筑的顶层实现物料的低成本、高效率安全运输的建筑施工物料输送结构及施工方法,包括施工建筑,施工建筑的侧壁设置有竖直输送系统,所述施工建筑顶部平台上方设置有水平输送系统,其中,所述施工建筑的侧壁设置有侧壁攀爬机构,施工建筑内设置有内部攀爬机构,所述水平输送系统设置于侧壁攀爬机构和内部攀爬机构上。本发明尤其适用于高楼层的建筑施工之中。
Building construction material conveying structure and construction method
The invention relates to the field of building engineering construction equipment, in particular to a building construction material conveying structure and a construction method, the building construction material conveying structure can climb upwards continuously along with building construction, so that low-cost, high-efficiency and safe conveying of materials on the top layer of a construction building is achieved continuously. The structure involves a construction building, a vertical conveying system is arranged on the side wall of the construction building, a horizontal conveying system is arranged above a top platform of the construction building, a side wall climbing mechanism is arranged on the side wall of the construction building, an internal climbing mechanism is arranged inside the construction building, and the horizontal conveying system is arranged on the side wall climbing mechanism and the internal climbing mechanism. The building construction material conveying structure and the construction method are particularly suitable for building construction of high floors.
本发明涉及建筑工程施工装备领域,尤其是一种可以随楼层修建而不断往上攀爬,从而不断实现对施工建筑的顶层实现物料的低成本、高效率安全运输的建筑施工物料输送结构及施工方法,包括施工建筑,施工建筑的侧壁设置有竖直输送系统,所述施工建筑顶部平台上方设置有水平输送系统,其中,所述施工建筑的侧壁设置有侧壁攀爬机构,施工建筑内设置有内部攀爬机构,所述水平输送系统设置于侧壁攀爬机构和内部攀爬机构上。本发明尤其适用于高楼层的建筑施工之中。
Building construction material conveying structure and construction method
建筑施工物料输送结构及施工方法
ZOU SHENGBIN (author)
2021-04-27
Patent
Electronic Resource
Chinese
Building material conveying device for construction engineering
European Patent Office | 2021
|