A platform for research: civil engineering, architecture and urbanism
WORKING PLATFORM SYSTEM AND METHOD FOR MOUNTING A WORKING PLATFORM SYSTEM
A working platform system (9) for a wind turbine (1) is described. Also a method for mounting such working platform system is described. The wind turbine comprises a wind turbine tower (2) and a nacelle (4) arranged on top of the wind turbine tower. The working platform system comprises a working platform (10) having a platform base (11), a platform floor (12) and a railing (13) attached to the platform base. In order to establish the working platform in an efficient way the working platform system further comprises: First counterpart connection means in the platform base (11). Second counterpart connection means in the main structure (35) of the nacelle. Two main beams (28), each beam comprising first connection means (31) in a first part (29) thereof for releasable cooperation with firstcounterpart connection means in the main structure of the nacelle, and further comprising second connection means (34) in a second part (30) thereof for releasable cooperation with second counterpartconnection means in the platform base (11).
描述了用于风力发电机(1)的工作平台系统(9)。还描述用于安装这样的工作平台系统的方法。风力发电机包括风力发电机塔架(2)、布置在风力发电机塔架顶部的机舱(4)。工作平台系统包括工作平台(10),该工作平台具有平台基座(11),平台地板(12)和附接到平台基座的栏杆(13)。为了高效地建立工作平台,该工作平台系统还包括:‑平台基座(11)中的第一配对连接装置。‑机舱的主结构(35)中的第二配对连接装置。‑两个主梁(28),每个梁包括在其第一部分(29)中的第一连接装置(31),用于与机舱主结构中的第一配对连接装置可释放地协作,并且还包括在其第二部分(30)中的第二连接装置(34)的,用于与平台基座(11)中的第二配对连接装置可释放地协作。
WORKING PLATFORM SYSTEM AND METHOD FOR MOUNTING A WORKING PLATFORM SYSTEM
A working platform system (9) for a wind turbine (1) is described. Also a method for mounting such working platform system is described. The wind turbine comprises a wind turbine tower (2) and a nacelle (4) arranged on top of the wind turbine tower. The working platform system comprises a working platform (10) having a platform base (11), a platform floor (12) and a railing (13) attached to the platform base. In order to establish the working platform in an efficient way the working platform system further comprises: First counterpart connection means in the platform base (11). Second counterpart connection means in the main structure (35) of the nacelle. Two main beams (28), each beam comprising first connection means (31) in a first part (29) thereof for releasable cooperation with firstcounterpart connection means in the main structure of the nacelle, and further comprising second connection means (34) in a second part (30) thereof for releasable cooperation with second counterpartconnection means in the platform base (11).
描述了用于风力发电机(1)的工作平台系统(9)。还描述用于安装这样的工作平台系统的方法。风力发电机包括风力发电机塔架(2)、布置在风力发电机塔架顶部的机舱(4)。工作平台系统包括工作平台(10),该工作平台具有平台基座(11),平台地板(12)和附接到平台基座的栏杆(13)。为了高效地建立工作平台,该工作平台系统还包括:‑平台基座(11)中的第一配对连接装置。‑机舱的主结构(35)中的第二配对连接装置。‑两个主梁(28),每个梁包括在其第一部分(29)中的第一连接装置(31),用于与机舱主结构中的第一配对连接装置可释放地协作,并且还包括在其第二部分(30)中的第二连接装置(34)的,用于与平台基座(11)中的第二配对连接装置可释放地协作。
WORKING PLATFORM SYSTEM AND METHOD FOR MOUNTING A WORKING PLATFORM SYSTEM
工作平台系统及安装工作平台系统的方法
SORENSEN TOMMY (author)
2020-04-24
Patent
Electronic Resource
Chinese
WORKING PLATFORM SYSTEM AND METHOD FOR MOUNTING A WORKING PLATFORM SYSTEM
European Patent Office | 2019
|