A platform for research: civil engineering, architecture and urbanism
Construction elevator shaping material receiving shed and construction method thereof
The invention relates to the technical field of building construction, and discloses a construction elevator shaping material receiving shed and a construction method thereof. The material receiving shed mainly comprises an overhang platform and a protection shed, and the overhang platform and the protection shed are connected into a whole. The material receiving shed sets the overhang length according to the distance between a building and a construction elevator, and personnel and construction materials take the construction elevator to enter a floor through the material receiving shed so asto achieve the aims of aerial falling object avoiding and material receiving. The material receiving shed is especially suitable for building without operation outer racks, no steel pipe rack material receiving platform needs to be set up, and therefore limb aerial work of workers is reduced, construction efficiency is improved, aerial falling objects are further avoided, and safety is improved.
本发明涉及建筑施工技术领域,公开了一种施工电梯定型化接料棚及其施工方法,该接料棚主要包括悬挑平台和防护棚两部分,两者连接形成一个整体,接料棚根据建筑与施工电梯两者间距设置悬挑长度,人员、施工材料乘坐施工电梯通过接料棚进入楼层,以达到防止高空坠物和接料的目的。尤其适合没有搭建操作外架的建筑,不需要另搭钢管架接料平台,从而减少工人临边高空作业,加快施工效率,进一步防止高空坠物,提高安全性。
Construction elevator shaping material receiving shed and construction method thereof
The invention relates to the technical field of building construction, and discloses a construction elevator shaping material receiving shed and a construction method thereof. The material receiving shed mainly comprises an overhang platform and a protection shed, and the overhang platform and the protection shed are connected into a whole. The material receiving shed sets the overhang length according to the distance between a building and a construction elevator, and personnel and construction materials take the construction elevator to enter a floor through the material receiving shed so asto achieve the aims of aerial falling object avoiding and material receiving. The material receiving shed is especially suitable for building without operation outer racks, no steel pipe rack material receiving platform needs to be set up, and therefore limb aerial work of workers is reduced, construction efficiency is improved, aerial falling objects are further avoided, and safety is improved.
本发明涉及建筑施工技术领域,公开了一种施工电梯定型化接料棚及其施工方法,该接料棚主要包括悬挑平台和防护棚两部分,两者连接形成一个整体,接料棚根据建筑与施工电梯两者间距设置悬挑长度,人员、施工材料乘坐施工电梯通过接料棚进入楼层,以达到防止高空坠物和接料的目的。尤其适合没有搭建操作外架的建筑,不需要另搭钢管架接料平台,从而减少工人临边高空作业,加快施工效率,进一步防止高空坠物,提高安全性。
Construction elevator shaping material receiving shed and construction method thereof
施工电梯定型化接料棚及其施工方法
ZHU YANLIN (author)
2020-05-05
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Adjustable material receiving equipment for building construction elevator
European Patent Office | 2022
|Detachable shaping protection operation shed for house building construction
European Patent Office | 2021
|