A platform for research: civil engineering, architecture and urbanism
The adjustable material receiving equipment for the building construction elevator comprises an operation platform, a short-distance lifting mechanism enabling materials to be stable is arranged on the outer wall of the operation platform, the lifting mechanism comprises a mounting frame, and the mounting frame is of a gantry structure and comprises a first gantry leg and a second gantry leg; the outer walls of the opposite faces of the first gantry leg and the second gantry leg are rotationally connected with rotating shafts, the outer walls of the two rotating shafts are fixedly connected with a first rotating frame and a second rotating frame correspondingly, the first rotating frame and the second rotating frame are arranged in a staggered mode, and the first rotating frame and the second rotating frame are each of a cross structure. And the rotating frame I and the rotating frame II are the same body. Through cooperation of the structures, stable conversion of the multiple material platforms is achieved, workers can conveniently extract materials, secondary lifting and descending can be conducted, the workers can conveniently extract the materials at different heights, and meanwhile the workers can conveniently supplement the materials.
本发明公开了一种可调式建筑施工升降机用接料设备,包括操作平台,所述操作平台的外壁设置有使物料平稳的短距抬升机构,所述抬升机构包括安装架,所述安装架为龙门构造,包括第一龙门腿和第二龙门腿,所述第一龙门腿和第二龙门腿的相对面的外壁均转动连接有转轴,两个所述转轴的外壁分别固定连接有转动架一和转动架二,所述转动架一和转动架二为错心设置,所述转动架一和转动架二均为十字架构造,且转动架一和转动架二为相同体。本发明通过上述等结构的配合,实现了多物料平台的平稳转换,便于工作人员对物料进行提取,且能够进行二次的提升和下降,方便工作人员对不同高度的物料进行提取,同时也方便工作人员进行补料。
The adjustable material receiving equipment for the building construction elevator comprises an operation platform, a short-distance lifting mechanism enabling materials to be stable is arranged on the outer wall of the operation platform, the lifting mechanism comprises a mounting frame, and the mounting frame is of a gantry structure and comprises a first gantry leg and a second gantry leg; the outer walls of the opposite faces of the first gantry leg and the second gantry leg are rotationally connected with rotating shafts, the outer walls of the two rotating shafts are fixedly connected with a first rotating frame and a second rotating frame correspondingly, the first rotating frame and the second rotating frame are arranged in a staggered mode, and the first rotating frame and the second rotating frame are each of a cross structure. And the rotating frame I and the rotating frame II are the same body. Through cooperation of the structures, stable conversion of the multiple material platforms is achieved, workers can conveniently extract materials, secondary lifting and descending can be conducted, the workers can conveniently extract the materials at different heights, and meanwhile the workers can conveniently supplement the materials.
本发明公开了一种可调式建筑施工升降机用接料设备,包括操作平台,所述操作平台的外壁设置有使物料平稳的短距抬升机构,所述抬升机构包括安装架,所述安装架为龙门构造,包括第一龙门腿和第二龙门腿,所述第一龙门腿和第二龙门腿的相对面的外壁均转动连接有转轴,两个所述转轴的外壁分别固定连接有转动架一和转动架二,所述转动架一和转动架二为错心设置,所述转动架一和转动架二均为十字架构造,且转动架一和转动架二为相同体。本发明通过上述等结构的配合,实现了多物料平台的平稳转换,便于工作人员对物料进行提取,且能够进行二次的提升和下降,方便工作人员对不同高度的物料进行提取,同时也方便工作人员进行补料。
Adjustable material receiving equipment for building construction elevator
一种可调式建筑施工升降机用接料设备
2022-05-13
Patent
Electronic Resource
Chinese
IPC:
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
/
E04G
SCAFFOLDING
,
Baugerüste
Temporary adjustable protection device for building elevator construction
European Patent Office | 2021
|Construction elevator shaping material receiving shed and construction method thereof
European Patent Office | 2020
|European Patent Office | 2015
|