Pipeline river-crossing structure by utilizing existing box culvert and construction method thereof
The invention is suitable for the technical field of municipal engineering, and provides a pipeline river-crossing structure by utilizing an existing box culvert and a construction method thereof. Thepipeline river-crossing structure comprises an externally-hung support, a pipeline box and a movable cover plate. The externally-hung support is fixed to the side wall of an existing box culvert through an installation assembly, the pipeline box is installed on the externally-hung support, a separation box chamber for municipal pipelines to penetrate through is formed in the pipeline box, an opening is formed in the top of the pipeline box, and the movable cover plate is installed at the opening in the top of the pipeline box. Municipal pipelines pass through the river through the pipeline river-crossing structure and then are connected with municipal pipelines on the two sides of the river channel. The pipeline river-crossing structure is arranged on the existing box culvert, the side wall of the existing box culvert is fully utilized as a stress component, consumables are reduced, the landscape effect is good, and the influence on river channel flood discharge is small. Meanwhile, the construction method of the pipeline river-crossing structure is high in feasibility, short in construction period and low in construction cost.
本发明适用于市政工程技术领域,提供了一种利用既有箱涵的管线过河结构及其施工方法。该管线过河结构包括外挂支架、管线箱以及活动盖板。外挂支架通过安装组件固定在既有箱涵的侧墙上,管线箱安装在外挂支架上,管线箱内部具有供市政管线穿过的分隔箱室,管线箱顶部具有开口,活动盖板安装于管线箱顶部开口处。市政管线利用管线过河结构过河,然后再与河道两侧的市政管线相接。本发明通过在既有箱涵上设置管线过河结构,充分利用既有箱涵的侧墙作为受力构件,减少耗材,景观效果较好,对河道行洪影响小。同时,本发明提供的管线过河结构的施工方法,可行性高,施工工期短,工程造价低。
Pipeline river-crossing structure by utilizing existing box culvert and construction method thereof
The invention is suitable for the technical field of municipal engineering, and provides a pipeline river-crossing structure by utilizing an existing box culvert and a construction method thereof. Thepipeline river-crossing structure comprises an externally-hung support, a pipeline box and a movable cover plate. The externally-hung support is fixed to the side wall of an existing box culvert through an installation assembly, the pipeline box is installed on the externally-hung support, a separation box chamber for municipal pipelines to penetrate through is formed in the pipeline box, an opening is formed in the top of the pipeline box, and the movable cover plate is installed at the opening in the top of the pipeline box. Municipal pipelines pass through the river through the pipeline river-crossing structure and then are connected with municipal pipelines on the two sides of the river channel. The pipeline river-crossing structure is arranged on the existing box culvert, the side wall of the existing box culvert is fully utilized as a stress component, consumables are reduced, the landscape effect is good, and the influence on river channel flood discharge is small. Meanwhile, the construction method of the pipeline river-crossing structure is high in feasibility, short in construction period and low in construction cost.
本发明适用于市政工程技术领域,提供了一种利用既有箱涵的管线过河结构及其施工方法。该管线过河结构包括外挂支架、管线箱以及活动盖板。外挂支架通过安装组件固定在既有箱涵的侧墙上,管线箱安装在外挂支架上,管线箱内部具有供市政管线穿过的分隔箱室,管线箱顶部具有开口,活动盖板安装于管线箱顶部开口处。市政管线利用管线过河结构过河,然后再与河道两侧的市政管线相接。本发明通过在既有箱涵上设置管线过河结构,充分利用既有箱涵的侧墙作为受力构件,减少耗材,景观效果较好,对河道行洪影响小。同时,本发明提供的管线过河结构的施工方法,可行性高,施工工期短,工程造价低。
Pipeline river-crossing structure by utilizing existing box culvert and construction method thereof
一种利用既有箱涵的管线过河结构及其施工方法
ZHOU QIANRU (author) / LIU XIAOHUA (author) / HU CHANGWEN (author) / CAO SHIDING (author) / WEI BIN (author) / TANG HAO (author) / XIE ZHENMING (author) / TIAN LEI (author) / XIE YONGYI (author) / LIU WEI (author)
2020-05-08
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Open cut tunnel over-crossing existing culvert structure and construction method thereof
European Patent Office | 2022
|Culvert crossing buried pipeline construction and pipeline laying method using the same
European Patent Office | 2016
|Connecting structure of new box culvert and existing road box culvert and construction method
European Patent Office | 2024
|European Patent Office | 2024
|