A platform for research: civil engineering, architecture and urbanism
Construction method for sandbag filling at deep-water cofferdam
The invention provides a construction method for sandbag filling at a deep-water cofferdam and relates to the field of engineering construction. The construction method for sandbag filling at the deep-water cofferdam comprises the steps that a layout ship is positioned to a first preset position; a barge is located to a second preset position near the layout ship; sandbags are paved on the layoutship and bound on a roller of the layout ship; bag heads of the sandbags are filled with sand in the barge; the roller is rotated, and the bag heads are sunk into water according to a preset path; thesand bags and sand tails are successively filled with the sand in the barge continuously; and the bag tails are sunk into water according to the preset path, so the sandbags are disposed at a third preset position in water. The construction method for sandbag filling at the deep-water cofferdam provided by the invention has the beneficial effects that positions of the sandbags can be more accurately positioned; and the sandbags can be paved at more accurate positions.
本发明提供了一种深水围堰充填砂袋施工方法,涉及工程施工领域。深水围堰充填砂袋施工方法,包括如下步骤:将铺排船定位至第一预设位置;将驳船定位至靠近于所述铺排船的第二预设位置;将砂袋铺设于所述铺排船上,并将砂袋捆绑于所述铺排船上的滚筒上;将所述驳船中砂填充于所述砂袋的袋头中;转动所述滚动,将所述袋头按照预设线路沉放于水中;继续将所述驳船中的砂依次填充于所述砂袋的袋中以及袋尾中;将所述袋尾按照预设线路沉放于水中,以使所述砂袋设置于水中的第三预设位置。本发明提供的深水围堰充填砂袋施工方法,可以实现对砂袋的位置更加准确的定位,可以使得砂袋铺设在更精确的位置。
Construction method for sandbag filling at deep-water cofferdam
The invention provides a construction method for sandbag filling at a deep-water cofferdam and relates to the field of engineering construction. The construction method for sandbag filling at the deep-water cofferdam comprises the steps that a layout ship is positioned to a first preset position; a barge is located to a second preset position near the layout ship; sandbags are paved on the layoutship and bound on a roller of the layout ship; bag heads of the sandbags are filled with sand in the barge; the roller is rotated, and the bag heads are sunk into water according to a preset path; thesand bags and sand tails are successively filled with the sand in the barge continuously; and the bag tails are sunk into water according to the preset path, so the sandbags are disposed at a third preset position in water. The construction method for sandbag filling at the deep-water cofferdam provided by the invention has the beneficial effects that positions of the sandbags can be more accurately positioned; and the sandbags can be paved at more accurate positions.
本发明提供了一种深水围堰充填砂袋施工方法,涉及工程施工领域。深水围堰充填砂袋施工方法,包括如下步骤:将铺排船定位至第一预设位置;将驳船定位至靠近于所述铺排船的第二预设位置;将砂袋铺设于所述铺排船上,并将砂袋捆绑于所述铺排船上的滚筒上;将所述驳船中砂填充于所述砂袋的袋头中;转动所述滚动,将所述袋头按照预设线路沉放于水中;继续将所述驳船中的砂依次填充于所述砂袋的袋中以及袋尾中;将所述袋尾按照预设线路沉放于水中,以使所述砂袋设置于水中的第三预设位置。本发明提供的深水围堰充填砂袋施工方法,可以实现对砂袋的位置更加准确的定位,可以使得砂袋铺设在更精确的位置。
Construction method for sandbag filling at deep-water cofferdam
一种深水围堰充填砂袋施工方法
SHI BENNING (author) / ZHAO HAIFENG (author) / HE XIAOWEN (author) / SUI MINGDI (author) / CHENG YUANMING (author) / LIAO YONGFEI (author) / LIU TAO (author)
2020-05-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
SANDBAG BAG, SANDBAG, AND INSTALLATION METHOD FOR SANDBAG
European Patent Office | 2015
|SANDBAG ASSEMBLY UNIT, SANDBAG STRUCTURE, AND SANDBAG CONNECTION DEVICE
European Patent Office | 2023
|