A platform for research: civil engineering, architecture and urbanism
One-time paving forming construction method for water-stable base layer
The invention provides a one-time paving forming construction method for a water-stable base layer, and relates to the technical field of road construction processes, the one-time paving forming construction method for the water-stable base layer comprises the following steps: measuring and setting out a road construction area to confirm the paving thickness in the construction area; according tothe paving thickness, primary paving construction of the mixture is carried out in the construction area, in the paving process, vibrating construction is carried out on the side edges of the two sides of the road in the construction area, and vibrating construction and paving construction are synchronously carried out; the vibration compaction operation of the side edge is synchronously completedin the paving process; therefore, tamping operation on two sides of a plurality of roads by manpower after paving is not needed any more; the technical problems that in the prior art, the flatness and compactness of the two sides of a road cannot be guaranteed due to the fact that the two sides of the road are blocked through formworks, meanwhile, the two sides of the road are tamped manually multiple times, the labor cost is high, the connecting defect between every two adjacent paving water-stable base layers is caused by multiple times of paving, and the paving efficiency is low are solved.
本发明提供了一种水稳基层一次摊铺成型施工方法,涉及道路施工工艺的技术领域,包括以下步骤:对道路施工区域进行测量放样,以确认施工区域内的摊铺厚度;根据摊铺厚度,在施工区域内进行混合料的一次摊铺施工,摊铺过程中,对施工区域道路两侧侧边进行振捣施工,振捣施工和摊铺施工同步运行;实现了在摊铺的过程中同步完成了侧边的振捣密实操作,因此不再需要摊铺后再通过人力多道路两侧进行夯实操作,缓解现有技术中存在的道路两侧利用模板阻挡,无法保证道路两侧的平整度以及密实度,同时利用人工多次对道路两侧进行夯实操作,造成人力成本高,以及多次摊铺造成相邻的两层摊铺水稳基层之间的连接缺陷,摊铺效率低的技术问题。
One-time paving forming construction method for water-stable base layer
The invention provides a one-time paving forming construction method for a water-stable base layer, and relates to the technical field of road construction processes, the one-time paving forming construction method for the water-stable base layer comprises the following steps: measuring and setting out a road construction area to confirm the paving thickness in the construction area; according tothe paving thickness, primary paving construction of the mixture is carried out in the construction area, in the paving process, vibrating construction is carried out on the side edges of the two sides of the road in the construction area, and vibrating construction and paving construction are synchronously carried out; the vibration compaction operation of the side edge is synchronously completedin the paving process; therefore, tamping operation on two sides of a plurality of roads by manpower after paving is not needed any more; the technical problems that in the prior art, the flatness and compactness of the two sides of a road cannot be guaranteed due to the fact that the two sides of the road are blocked through formworks, meanwhile, the two sides of the road are tamped manually multiple times, the labor cost is high, the connecting defect between every two adjacent paving water-stable base layers is caused by multiple times of paving, and the paving efficiency is low are solved.
本发明提供了一种水稳基层一次摊铺成型施工方法,涉及道路施工工艺的技术领域,包括以下步骤:对道路施工区域进行测量放样,以确认施工区域内的摊铺厚度;根据摊铺厚度,在施工区域内进行混合料的一次摊铺施工,摊铺过程中,对施工区域道路两侧侧边进行振捣施工,振捣施工和摊铺施工同步运行;实现了在摊铺的过程中同步完成了侧边的振捣密实操作,因此不再需要摊铺后再通过人力多道路两侧进行夯实操作,缓解现有技术中存在的道路两侧利用模板阻挡,无法保证道路两侧的平整度以及密实度,同时利用人工多次对道路两侧进行夯实操作,造成人力成本高,以及多次摊铺造成相邻的两层摊铺水稳基层之间的连接缺陷,摊铺效率低的技术问题。
One-time paving forming construction method for water-stable base layer
水稳基层一次摊铺成型施工方法
WANG YUEQI (author) / JING XIANGYANG (author) / XIE TAO (author) / WANG YULONG (author)
2020-05-15
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
European Patent Office | 2024
|Paving construction method for large-thickness wide-width water stable layer
European Patent Office | 2021
|European Patent Office | 2024
|Water-stable double-layer continuous paving construction method based on intelligent compaction
European Patent Office | 2023
|Method for paving asphalt pavement with water stable layer
European Patent Office | 2020
|