A platform for research: civil engineering, architecture and urbanism
Basement bottom plate pre-laying anti-sticking TPO waterproof coiled material construction method
The invention discloses a basement bottom plate pre-laying anti-sticking TPO waterproof coiled material construction method, and relates to the technical field of underground building waterproofing. The method comprises the following steps of 1, base layer treatment, specifically, treating a base layer internal corner and a base layer external corner into an arc shape or a slope angle; 2, pile head treatment, specifically, cleaning a pile head, and coating the pile head and the periphery of the pile head with waterproof coating layers; 3, line snapping, specifically, paying off on the base layer and snapping out a planning line for paving the TPO waterproof coiled material; 4, pre-laying a coiled material, specifically, pre-laying the TPO waterproof coiled material on the base layer according to the planning line; and 5, welding joints of the coiled material, specifically, welding the joints of the TPO waterproof coiled material by using hot air welding equipment. The method is wide inapplication range, good in waterproof performance and free of waterproof blind areas.
本发明公开了一种地下室底板预铺反粘TPO防水卷材施工方法,涉及地下建筑防水技术领域,包括:步骤1、基层处理:将基层阴角和基层阳角处理成圆弧状或坡角;步骤2、桩头处理:清理桩头,在所述桩头上及所述桩头的四周涂刷防水涂料层;步骤3、弹线:在所述基层上放线弹出所述TPO防水卷材铺贴的规划线;步骤4、预铺卷材:将所述TPO防水卷材按照所述规划线预铺在所述基层上;步骤5、焊接卷材接缝:使用热风焊接设备对所述TPO防水卷材的接缝进行焊接;该方法应用范围广,防水性能好,无防水盲区。
Basement bottom plate pre-laying anti-sticking TPO waterproof coiled material construction method
The invention discloses a basement bottom plate pre-laying anti-sticking TPO waterproof coiled material construction method, and relates to the technical field of underground building waterproofing. The method comprises the following steps of 1, base layer treatment, specifically, treating a base layer internal corner and a base layer external corner into an arc shape or a slope angle; 2, pile head treatment, specifically, cleaning a pile head, and coating the pile head and the periphery of the pile head with waterproof coating layers; 3, line snapping, specifically, paying off on the base layer and snapping out a planning line for paving the TPO waterproof coiled material; 4, pre-laying a coiled material, specifically, pre-laying the TPO waterproof coiled material on the base layer according to the planning line; and 5, welding joints of the coiled material, specifically, welding the joints of the TPO waterproof coiled material by using hot air welding equipment. The method is wide inapplication range, good in waterproof performance and free of waterproof blind areas.
本发明公开了一种地下室底板预铺反粘TPO防水卷材施工方法,涉及地下建筑防水技术领域,包括:步骤1、基层处理:将基层阴角和基层阳角处理成圆弧状或坡角;步骤2、桩头处理:清理桩头,在所述桩头上及所述桩头的四周涂刷防水涂料层;步骤3、弹线:在所述基层上放线弹出所述TPO防水卷材铺贴的规划线;步骤4、预铺卷材:将所述TPO防水卷材按照所述规划线预铺在所述基层上;步骤5、焊接卷材接缝:使用热风焊接设备对所述TPO防水卷材的接缝进行焊接;该方法应用范围广,防水性能好,无防水盲区。
Basement bottom plate pre-laying anti-sticking TPO waterproof coiled material construction method
一种地下室底板预铺反粘TPO防水卷材施工方法
WANG HAICHENG (author) / JIANG YANJUN (author) / YANG YUE (author) / ZHANG CHAN (author) / CHEN CHUNRONG (author) / HU QINGHUA (author)
2020-05-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for laying anti-sticking waterproof coiled material on basement raft in advance
European Patent Office | 2021
|Coiled material waterproof laying equipment and coiled material waterproof laying method
European Patent Office | 2021
|Waterproof structure for laying drainage plate on basement bottom plate and construction method
European Patent Office | 2024
|Polymer waterproof coiled material laying construction method
European Patent Office | 2020
|