Tower crane pedestrian passage structure on climbing frame
The invention discloses a tower crane pedestrian passage structure on a climbing frame. The tower crane pedestrian passage structure comprises the integral lifting climbing frame arranged on one sideof a tower crane. A keel plate is fixedly connected to the side, close to the tower crane, of the integral lifting climbing frame. A hoisting ring is welded to the outer end of the keel plate. A transverse keel is fixed to the portion, located above the keel plate, of the integral lifting climbing frame. The lower end of a steel wire rope is connected with the hoisting ring. The upper end of the steel wire rope and the transverse keel are tied and fixed. An overturning plate is hinged to the outer end of the keel plate. The overturning plate is erected on a tower crane standard joint after being unfolded. According to the tower crane pedestrian passage structure, a tower crane pedestrian passage is mounted on the integral lifting climbing frame, the tower crane pedestrian passage structurecan be raised along with the rising of the integral lifting climbing frame, the situation that the tower crane pedestrian passage is erected multiple times by workers in the high altitude is avoided,and the problems of complicated processes and the like of multiple times of high-altitude erecting of the tower crane pedestrian passage are solved, the safety and reliability of the tower crane pedestrian passage are improved, the risk of climbing a vertical ladder by a driver is reduced, the time of climbing the vertical ladder by the driver is shortened, and the working efficiency is improved.
本发明公开了一种爬架上塔吊行人通道结构,包括设置在塔吊一侧的整体式提升爬架,在整体式提升爬架靠近塔吊的一侧固定连接有龙骨板,在龙骨板的外端焊接有吊环,在整体式提升爬架上位于龙骨板上方固定有横龙骨,所述的,钢丝绳的下端与吊环连接,钢丝绳的上端与横龙骨拉结固定,在龙骨板的外端铰链连接有翻板,翻板展开后搭设在塔吊标准节上。本发明在整体式提升爬架上安装塔吊行人通道,该塔吊行人通道可以随着整体式提升爬架升高而升高,避免工人在高空时多次搭设塔吊行人通道,以解决塔吊行人通道多次高空搭设工序繁杂等问题,提高塔吊行人通道的安全可靠性,减少司机攀爬竖直爬梯的风险和时间,提高工作效率。
Tower crane pedestrian passage structure on climbing frame
The invention discloses a tower crane pedestrian passage structure on a climbing frame. The tower crane pedestrian passage structure comprises the integral lifting climbing frame arranged on one sideof a tower crane. A keel plate is fixedly connected to the side, close to the tower crane, of the integral lifting climbing frame. A hoisting ring is welded to the outer end of the keel plate. A transverse keel is fixed to the portion, located above the keel plate, of the integral lifting climbing frame. The lower end of a steel wire rope is connected with the hoisting ring. The upper end of the steel wire rope and the transverse keel are tied and fixed. An overturning plate is hinged to the outer end of the keel plate. The overturning plate is erected on a tower crane standard joint after being unfolded. According to the tower crane pedestrian passage structure, a tower crane pedestrian passage is mounted on the integral lifting climbing frame, the tower crane pedestrian passage structurecan be raised along with the rising of the integral lifting climbing frame, the situation that the tower crane pedestrian passage is erected multiple times by workers in the high altitude is avoided,and the problems of complicated processes and the like of multiple times of high-altitude erecting of the tower crane pedestrian passage are solved, the safety and reliability of the tower crane pedestrian passage are improved, the risk of climbing a vertical ladder by a driver is reduced, the time of climbing the vertical ladder by the driver is shortened, and the working efficiency is improved.
本发明公开了一种爬架上塔吊行人通道结构,包括设置在塔吊一侧的整体式提升爬架,在整体式提升爬架靠近塔吊的一侧固定连接有龙骨板,在龙骨板的外端焊接有吊环,在整体式提升爬架上位于龙骨板上方固定有横龙骨,所述的,钢丝绳的下端与吊环连接,钢丝绳的上端与横龙骨拉结固定,在龙骨板的外端铰链连接有翻板,翻板展开后搭设在塔吊标准节上。本发明在整体式提升爬架上安装塔吊行人通道,该塔吊行人通道可以随着整体式提升爬架升高而升高,避免工人在高空时多次搭设塔吊行人通道,以解决塔吊行人通道多次高空搭设工序繁杂等问题,提高塔吊行人通道的安全可靠性,减少司机攀爬竖直爬梯的风险和时间,提高工作效率。
Tower crane pedestrian passage structure on climbing frame
一种爬架上塔吊行人通道结构
WEI DONG (author) / LIU QING (author) / YANG BOWEN (author) / QUAN XIANGWEN (author) / XIE FENGYUN (author) / WANG JIE (author)
2020-05-19
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Bridge high pier climbing frame and tower crane integrated system